IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v30y2012i2p151-164.html
   My bibliography  Save this article

Transaction-related issues and construction project performance

Author

Listed:
  • Huimin Li
  • David Arditi
  • Zhuofu Wang

Abstract

Transaction cost economics deals with costs incurred at the pre-contract phase such as the costs of conducting market research, exploring financial opportunities, conducting a feasibility study, organizing a bidding/negotiation and managing design; and with costs incurred in the post-contract phase such as the costs of administering the contract, administering change orders and claims, resolving disputes and managing incentives. Many researchers have investigated the factors that affect project performance over the years, but neglected to consider transaction-related issues. The effects of transaction-related issues on project performance are investigated in this study. Project performance is measured on the basis of completion within budget and on schedule, compliance with quality standards, and satisfaction of the owner. Transaction-related issues include the magnitude of transaction costs, the uncertainty in the transaction environment, and the owner’s and the contractor’s roles in the transaction. Hypotheses are tested by using a structural equation model using data collected from a survey administered to construction owners. The findings indicate that project performance can be stronger if the uncertainty in the transaction environment is minimized, transaction costs are kept low, and owners and contractors are sensitive to transaction-related issues.

Suggested Citation

  • Huimin Li & David Arditi & Zhuofu Wang, 2012. "Transaction-related issues and construction project performance," Construction Management and Economics, Taylor & Francis Journals, vol. 30(2), pages 151-164, January.
  • Handle: RePEc:taf:conmgt:v:30:y:2012:i:2:p:151-164
    DOI: 10.1080/01446193.2012.655254
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2012.655254
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2012.655254?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jaafer Y. Altarawneh & Vinesh Thiruchelvam & Behrang Samadi, 2018. "Analysis of Critical Success Factors Influence on Critical Delays for Water Infrastructure Construction Projects in the Abu Dhabi emirate Using PLS-SEM Method," International Business Research, Canadian Center of Science and Education, vol. 11(2), pages 16-32, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:30:y:2012:i:2:p:151-164. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.