Prediction of schedule performance of Indian construction projects using an artificial neural network

Author

Listed:
  • Kumar Neeraj Jha
  • CT Chockalingam

Abstract

Approximately 42% of Indian government-funded construction projects are facing time overruns. With a number of challenging projects around the corner, there is a definite need to overcome these delays. In an earlier study conducted by one of the authors, 55 project performance attributes were identified based on expert opinions and literature surveys, which were subsequently reduced to 20 factors (11 success and nine failure factors) using factor analysis. A second-stage questionnaire survey based on these factors was used to identify the significant schedule performance factors. The analysis of the survey responses led us to conclude that factors such as: a project manager’s competence; monitoring and feedback by project participants; commitment of all project participants; owner’s competence; interaction between external project participants; and good coordination between project participants significantly affect schedule performance. The survey also provided the basis for the development of a schedule performance prediction model. For this, an artificial neural network (ANN) method was used to construct the model, and the best was determined to be a 6-3-1 feed-forward neural network based on a back-propagation algorithm with a mean absolute percentage deviation (MAPD) of 11%. This enables project team members to understand the factors they must monitor closely in order to complete the projects on schedule and to predict performance throughout the course of the project.

Suggested Citation

  • Kumar Neeraj Jha & CT Chockalingam, 2011. "Prediction of schedule performance of Indian construction projects using an artificial neural network," Construction Management and Economics, Taylor & Francis Journals, vol. 29(9), pages 901-911, July.
  • Handle: RePEc:taf:conmgt:v:29:y:2011:i:9:p:901-911
    DOI: 10.1080/01446193.2011.608691
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2011.608691
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2011.608691?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kumar Virender & Pandey Amrendra & Singh Rahul, 2023. "Project success and critical success factors of construction projects: project practitioners’ perspectives," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 1-22, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:29:y:2011:i:9:p:901-911. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.