IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v29y2011i4p355-370.html
   My bibliography  Save this article

Progress monitoring of construction projects using pattern recognition techniques

Author

Listed:
  • Ashraf Elazouni
  • Osama Salem

Abstract

Project monitoring involves collecting the actual-progress data, and comparing them against the relevant planned-progress data to evaluate the overall project progress at specified cut-off dates. Inevitable issues including variations in reporting skills as well as the willingness to record accurate data impact on the quality of the collected data. Comparison against multiple possible benchmarks (one-to-many) rather than a single benchmark (one-to-one) offers the potential to alleviate the negative impact of low-quality data on the progress evaluation. Special patterns, which can be readily manipulated within computer programs, are devised to encode the planned and actual progress at the cut-off dates. Basically, pattern recognition techniques are utilized to classify the multiple patterns representing the planned progress at a given cut-off date and the classification is used to evaluate the pattern representing the actual progress at the same date. The pattern recognition techniques generalize a virtual benchmark to represent the planned progress based on multiple patterns generated at a given cut-off date and representing possible benchmarks. In addition to the alleviation of the negative impact of low-quality data on the progress evaluation, the generalization feature potentially encourages a long-run attitude in site personnel to report high-quality data. Finally, the pattern recognition concept and technique proved their robustness to monitor and evaluate the overall progress of the projects based on the technique of critical path method.

Suggested Citation

  • Ashraf Elazouni & Osama Salem, 2011. "Progress monitoring of construction projects using pattern recognition techniques," Construction Management and Economics, Taylor & Francis Journals, vol. 29(4), pages 355-370.
  • Handle: RePEc:taf:conmgt:v:29:y:2011:i:4:p:355-370
    DOI: 10.1080/01446193.2011.554846
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446193.2011.554846
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2011.554846?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. R. Navon & Y. Shpatnitsky, 2005. "A model for automated monitoring of road construction," Construction Management and Economics, Taylor & Francis Journals, vol. 23(9), pages 941-951.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chi Ming Tam & Thomas Tong & Bill Wong, 2007. "An integrated system for earthmoving planning," Construction Management and Economics, Taylor & Francis Journals, vol. 25(11), pages 1127-1137.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:29:y:2011:i:4:p:355-370. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.