Demystifying the cost barriers to offsite construction in the UK
Author
Abstract
Suggested Citation
DOI: 10.1080/01446193.2011.637938
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hong Xue & Shoujian Zhang & Yikun Su & Zezhou Wu, 2018. "Capital Cost Optimization for Prefabrication: A Factor Analysis Evaluation Model," Sustainability, MDPI, vol. 10(1), pages 1-22, January.
- Xue, Hong & Wu, Zezhou & Sun, Zhi & Jiao, Shuaishuai, 2021. "Effects of policy on developer's implementation of off-site construction: The mediating role of the market environment," Energy Policy, Elsevier, vol. 155(C).
- Marina Marinelli & Ashwini Konanahalli & Rupesh Dwarapudi & Mukund Janardhanan, 2022. "Assessment of Barriers and Strategies for the Enhancement of Off-Site Construction in India: An ISM Approach," Sustainability, MDPI, vol. 14(11), pages 1-20, May.
- Dandan He & Zhongfu Li & Chunlin Wu & Xin Ning, 2018. "An E-Commerce Platform for Industrialized Construction Procurement Based on BIM and Linked Data," Sustainability, MDPI, vol. 10(8), pages 1-21, July.
- Alasdair Reid, 2023. "Closing the Affordable Housing Gap: Identifying the Barriers Hindering the Sustainable Design and Construction of Affordable Homes," Sustainability, MDPI, vol. 15(11), pages 1-27, May.
- Hong Xue & Shoujian Zhang & Yikun Su & Zezhou Wu, 2017. "Factors Affecting the Capital Cost of Prefabrication—A Case Study of China," Sustainability, MDPI, vol. 9(9), pages 1-22, August.
- Satheeskumar Navaratnam, 2022. "Selecting a Suitable Sustainable Construction Method for Australian High-Rise Building: A Multi-Criteria Analysis," Sustainability, MDPI, vol. 14(12), pages 1-17, June.
- Zezhou Wu & Lirong Luo & Heng Li & Ying Wang & Guoqiang Bi & Maxwell Fordjour Antwi-Afari, 2021. "An Analysis on Promoting Prefabrication Implementation in Construction Industry towards Sustainability," IJERPH, MDPI, vol. 18(21), pages 1-21, October.
- Kaicheng Shen & Chen Cheng & Xiaodong Li & Zhihui Zhang, 2019. "Environmental Cost-Benefit Analysis of Prefabricated Public Housing in Beijing," Sustainability, MDPI, vol. 11(1), pages 1-21, January.
- Ayaz Ahmad Khan & Rongrong Yu & Tingting Liu & Ning Gu & James Walsh, 2023. "Volumetric Modular Construction Risks: A Comprehensive Review and Digital-Technology-Coupled Circular Mitigation Strategies," Sustainability, MDPI, vol. 15(8), pages 1-34, April.
- Jeong-hoon Lee & Jin-sung Kim & Hak-ju Lee & Young-Min Lee & Hyung-Geun Kim, 2019. "Small-Scale Public Rental Housing Development Using Modular Construction—Lessons learned from Case Studies in Seoul, Korea," Sustainability, MDPI, vol. 11(4), pages 1-18, February.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:29:y:2011:i:11:p:1081-1099. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.