IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v28y2010i9p985-995.html
   My bibliography  Save this article

Cost modelling in underpinning projects

Author

Listed:
  • Jouko Lennart Lehtonen
  • Juhani Matti Kiiras

Abstract

Large refurbishment projects are characterized by highly varied costs from one project to another. In Finnish underpinning, only retrospective analysis of costs has been available for the owner's decision process. In order to develop tools for pre-tender cost estimating and for comparison of different design solutions and evaluation of tenders of the underpinning project, two different cost models have been developed for research. In both models developed, the minimum data required is the pile length. In the more detailed model, the assessment is based on the design solution, including known pile types and the load transfer classification. Both models are easy to use, and the percentage of explained variance is fairly good in the more detailed model.

Suggested Citation

  • Jouko Lennart Lehtonen & Juhani Matti Kiiras, 2010. "Cost modelling in underpinning projects," Construction Management and Economics, Taylor & Francis Journals, vol. 28(9), pages 985-995.
  • Handle: RePEc:taf:conmgt:v:28:y:2010:i:9:p:985-995
    DOI: 10.1080/01446193.2010.487537
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446193.2010.487537
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2010.487537?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:28:y:2010:i:9:p:985-995. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.