IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v28y2010i3p255-270.html
   My bibliography  Save this article

Construction industry performance improvement programmes: the UK case of demonstration projects in the 'Continuous Improvement' programme

Author

Listed:
  • Hedley Smyth

Abstract

There has been a range of initiatives across many countries over the last 10 to 15 years to introduce reform to the construction process in order to improve performance. The so-called UK 'Continuous Improvement' programme is evaluated as a case study through an analysis of demonstration projects. These projects symbolically represent best practice for others to follow directly in the UK and through influence indirectly in other countries. This raises methodological challenges, yet the scant empirical attention given to this field justifies such attention. The main conclusion is that there have been improvements, yet these seem not to have been continuous. Contractors are distant from direct value creation, increasingly relying upon others in the supply chain. Improvement measures have not penetrated most supply chains. This suggests that contractors need to develop learning and competency capacity; especially stakeholder management and/or clients need to identify new solution providers. There has been little direct evidence of this and the current environment is placing emphasis upon price rather than value. Capacity and capabilities for continuous improvement appear largely transient and insufficiently embedded to persist where present.

Suggested Citation

  • Hedley Smyth, 2010. "Construction industry performance improvement programmes: the UK case of demonstration projects in the 'Continuous Improvement' programme," Construction Management and Economics, Taylor & Francis Journals, vol. 28(3), pages 255-270.
  • Handle: RePEc:taf:conmgt:v:28:y:2010:i:3:p:255-270
    DOI: 10.1080/01446190903505948
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190903505948
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190903505948?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bossink, Bart A.G., 2017. "Demonstrating sustainable energy: A review based model of sustainable energy demonstration projects," Renewable and Sustainable Energy Reviews, Elsevier, vol. 77(C), pages 1349-1362.
    2. Stephen Gruneberg, 2013. "Construction Contract Preparation and Management: From Concept to Completion," Construction Management and Economics, Taylor & Francis Journals, vol. 31(12), pages 1217-1219, December.
    3. Jingfeng Yuan & Wen Yi & Mengyi Miao & Lei Zhang, 2018. "Evaluating the Impacts of Health, Social Network and Capital on Craft Efficiency and Productivity: A Case Study of Construction Workers in China," IJERPH, MDPI, vol. 15(2), pages 1-25, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:28:y:2010:i:3:p:255-270. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.