IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v27y2009i6p597-604.html
   My bibliography  Save this article

From demand driven contractor selection towards value driven contractor selection

Author

Listed:
  • Arjan Walraven
  • Bauke de Vries

Abstract

The procurement of a construction contractor should consider more aspects than only cost or price. Taking value and price into account to select the 'best value for money' bid results in adopting a structured multi-criteria approach. An alternative contractor selection method is presented, which identifies the contractor with the best potential to deliver the highest value for money. An investigation of the client needs and product performances for contractor selection has been conducted for a building type, and the relative weight of each product performance is analysed through a questionnaire. The relative weights of the product performances are identified by allocating a fictional budget to the client needs and translating these values into the relative weight of the product performances by using the quality function deployment method. In the contractor selection method, the relative importance of the product performances are combined with the scores of the bids, resulting in the best bid and contractor in a specific building project.

Suggested Citation

  • Arjan Walraven & Bauke de Vries, 2009. "From demand driven contractor selection towards value driven contractor selection," Construction Management and Economics, Taylor & Francis Journals, vol. 27(6), pages 597-604.
  • Handle: RePEc:taf:conmgt:v:27:y:2009:i:6:p:597-604
    DOI: 10.1080/01446190902933356
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190902933356
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190902933356?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tirataci Hakan & Yaman Hakan, 2023. "Estimation of ideal construction duration in tender preparation stage for housing projects," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 192-212, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:27:y:2009:i:6:p:597-604. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.