IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v26y2008i10p1067-1077.html
   My bibliography  Save this article

Maintenance cost implications of utilizing bathroom modules manufactured offsite

Author

Listed:
  • Wei Pan
  • Alistair Gibb
  • Andrew Sellars

Abstract

Though the benefits from using offsite technologies have been rehearsed, their uptake within the UK construction industry is slow. A critical barrier is the lack of cost data of using such technology. Another is the unsubstantiated perception that maintenance of offsite solutions is difficult and expensive. But, yet again, there appear to be no data publicly available on this topic. This knowledge gap is addressed by presenting the cost data of maintaining offsite and insitu bathrooms for student accommodation. The records of 732 maintenance jobs were investigated. These jobs span three years for 398 bathrooms, including precast concrete modules, glass reinforced polyester (GRP) modules and insitu bathrooms. The results suggest that GRP modules required the lowest maintenance costs, while insitu bathrooms were significantly more expensive to maintain. For offsite modules, drainage, toilets, vents and sink were identified as the main problematic areas for maintenance. The maintenance of insitu bathrooms was more complex and involved a wider range of problematic areas. The design imposed significant effects on the long-term cost of offsite bathrooms. Aspirations of clients need to be fully understood and integrated into design. The findings should facilitate the design decision making of using offsite bathrooms for residential buildings.

Suggested Citation

  • Wei Pan & Alistair Gibb & Andrew Sellars, 2008. "Maintenance cost implications of utilizing bathroom modules manufactured offsite," Construction Management and Economics, Taylor & Francis Journals, vol. 26(10), pages 1067-1077.
  • Handle: RePEc:taf:conmgt:v:26:y:2008:i:10:p:1067-1077
    DOI: 10.1080/01446190802422161
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190802422161
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190802422161?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hong Xue & Shoujian Zhang & Yikun Su & Zezhou Wu, 2018. "Capital Cost Optimization for Prefabrication: A Factor Analysis Evaluation Model," Sustainability, MDPI, vol. 10(1), pages 1-22, January.
    2. Lei Jiang & Zhongfu Li & Long Li & Tiankun Li & Yunli Gao, 2018. "A Framework of Industrialized Building Assessment in China Based on the Structural Equation Model," IJERPH, MDPI, vol. 15(8), pages 1-20, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:26:y:2008:i:10:p:1067-1077. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.