IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v24y2006i9p933-944.html
   My bibliography  Save this article

The determination of occupancy costs during early project phases

Author

Listed:
  • Christian Stoy
  • Wolfdietrich Kalusche

Abstract

In addition to the earnings, costs determine the commercial success of real estate investments. The discussion in the German-speaking region focuses on occupancy costs and their planning. When planning, the occupancy costs must be determined early, continually monitored, and controlled if necessary. A process for determining occupancy costs, the construction element process, is presented and tested using an actual property. The test results deviate by only approximately 8% from the occupancy costs actually incurred. The process demonstrates its suitability for the early determination of occupancy costs using only a few pieces of data on the property. However, it does require occupancy cost indicators. Also, the significant drivers of these indictors must be known in order to select the appropriate indicator. For this reason, future work on occupancy costs must not only collect additional data, but the data must also be analysed with regard to the cost drivers.

Suggested Citation

  • Christian Stoy & Wolfdietrich Kalusche, 2006. "The determination of occupancy costs during early project phases," Construction Management and Economics, Taylor & Francis Journals, vol. 24(9), pages 933-944.
  • Handle: RePEc:taf:conmgt:v:24:y:2006:i:9:p:933-944
    DOI: 10.1080/01446190600799307
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190600799307
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190600799307?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:24:y:2006:i:9:p:933-944. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.