IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v20y2002i5p415-423.html
   My bibliography  Save this article

The divergence in aggregate and activity estimates of US construction productivity

Author

Listed:
  • Paul Goodrum
  • Carl Haas
  • Robert Glover

Abstract

Discrepancies exist between aggregate and activity productivity measurements in the US construction industry. Multiple studies using aggregate industry measures suggest that construction productivity has declined over the long term. A longstanding problem with the aggregate measures concerns the difficulty of controlling for inflation so as to accurately measure real output. As an alternative, average activity productivity, measured by individual work activities, indicates that construction productivity has increased over the same time period. Activity measurement data have been collected for 200 construction activities over a 22-year time period from commercial estimation manuals used by contractors and owners to estimate the cost and time requirements for construction. This paper examines the discrepancies between aggregate and activity measurements and suggests possible reasons for their existence.

Suggested Citation

  • Paul Goodrum & Carl Haas & Robert Glover, 2002. "The divergence in aggregate and activity estimates of US construction productivity," Construction Management and Economics, Taylor & Francis Journals, vol. 20(5), pages 415-423.
  • Handle: RePEc:taf:conmgt:v:20:y:2002:i:5:p:415-423
    DOI: 10.1080/01446190210145868
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190210145868
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190210145868?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xueqing Wang & Yuan Chen & Bingsheng Liu & Yinghua Shen & Hui Sun, 2013. "A total factor productivity measure for the construction industry and analysis of its spatial difference: a case study in China," Construction Management and Economics, Taylor & Francis Journals, vol. 31(10), pages 1059-1071, October.
    2. Le Ma & Chunlu Liu, 2014. "Did the late-2000s financial crisis influence construction labour productivity?," Construction Management and Economics, Taylor & Francis Journals, vol. 32(10), pages 1030-1047, October.
    3. Daniel Garcia & Raven S. Molloy, 2023. "Can Measurement Error Explain Slow Productivity Growth in Construction?," Finance and Economics Discussion Series 2023-052, Board of Governors of the Federal Reserve System (U.S.).
    4. Diane Coyle & Rehema Msulwa, 2024. "Digital Concrete: Productivity in Infrastructure Construction," NBER Chapters, in: Technology, Productivity, and Economic Growth, National Bureau of Economic Research, Inc.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:20:y:2002:i:5:p:415-423. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.