Measurement of the performance of ready mixed concreting resources as data for system simulation

Author

Listed:
  • M. Anson
  • S. L. Tang
  • K. C. Ying

Abstract

Concrete is a very important construction industry material, and this is especially true in Hong Kong. The efficient organization of the supply of concrete from ready mixed concrete plants is beneficial to both concrete companies and contractors. It is also essential for an efficient construction industry, since a very high propor1 tion of the in situ concrete in Hong Kong is supplied ready mixed from an off-site plant. Whether concrete companies in Hong Kong are using their resources well and are able to satisfactorily match the timing of their deliveries to construction site needs are questions discussed in this paper, based on data collected by the authors. The data are planned for use in validating a simulation model of ready mixed concrete plant operations in Hong Kong. The third author spent 20 weeks in 1999-2000 at concrete batching plants in Hong Kong, studying their operations. Data on a sample of 15 typical operational days at four plants, which included 295 pours on sites and 1677 truckmixer trips, are presented. Truckmixer journey times for delivering concrete and journey times for returning to plants and their distributions have been found. Queuing statistics for truckmixers on site waiting to be unloaded, placing times when unloading concrete, washing out and waiting times on sites after unloading, and delays in the continuous delivery of concrete are also described. Service has been studied in terms of the matching achieved between site delivery timing require1 ments and the need to use truckmixers efficiently. For the 295 pours, the relationship is shown between gaps in the supply of concrete to site and the extent to which truckmixers are bunched in a queue on site. Matching was found to be good for only 17% of the 295 pours, the variability in service received by different sites is considerable, and the importance of studying the truckmixer scheduling problem is highlighted, so that this variability might be reduced and extreme cases eliminated.

Suggested Citation

  • M. Anson & S. L. Tang & K. C. Ying, 2002. "Measurement of the performance of ready mixed concreting resources as data for system simulation," Construction Management and Economics, Taylor & Francis Journals, vol. 20(3), pages 237-250.
  • Handle: RePEc:taf:conmgt:v:20:y:2002:i:3:p:237-250
    DOI: 10.1080/01446190210121297
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190210121297
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190210121297?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Min, Wu & Sui Pheng, Low, 2007. "Modeling just-in-time purchasing in the ready mixed concrete industry," International Journal of Production Economics, Elsevier, vol. 107(1), pages 190-201, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:20:y:2002:i:3:p:237-250. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.