Australian project time-cost analysis: Statistical analysis of intertemporal trends

Author

Listed:
  • Martin Skitmore
  • NG Thomas

Abstract

In statistical analysis of intertemporal movements in time-cost relationships via the Bromilow model it is shown that for Ng et al.'s (2001) Australian data, the K value is not significantly different from unity. This is utilized to develop a new and simpler ratio measure of the time-cost relationship, which has the advantage of being obtainable for each project. A scatter plot and a statistical analysis of the project ratios indicate significant yearly fluctuations but no underlying trend. Assuming similar characteristics of the data from previous studies, equivalent average ratios are estimated and plotted, confirming Ng et al.'s visual appearance of a possible downward trend. However, the statistical analysis is inconclusive on the issue, there being insufficient data (six points) for a full analysis.

Suggested Citation

  • Martin Skitmore & NG Thomas, 2001. "Australian project time-cost analysis: Statistical analysis of intertemporal trends," Construction Management and Economics, Taylor & Francis Journals, vol. 19(5), pages 455-458.
  • Handle: RePEc:taf:conmgt:v:19:y:2001:i:5:p:455-458
    DOI: 10.1080/01446193.2001.9709621
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446193.2001.9709621
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2001.9709621?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. P. Velumani & N. V. N. Nampoothiri & M. UrbaƄski, 2021. "A Comparative Study of Models for the Construction Duration Prediction in Highway Road Projects of India," Sustainability, MDPI, vol. 13(8), pages 1-13, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:19:y:2001:i:5:p:455-458. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.