An evaluation of the use of insurance in managing construction risks

Author

Listed:
  • Henry Odeyinka

Abstract

One of the major methods of managing construction risks in the Nigerian construction industry is the insurance method. On the basis of data from some selected construction sites in Nigeria, this paper evaluates the effectiveness of the method. Also it identifies, through a questionnaire survey, the various insurable construction risks perceived to be encountered in the Nigerian construction industry and the types of insurance policy employed in managing them. High importance is placed by the construction industry on site security, construction risk, and health and welfare requirements, and the use of an all-risk insurance policy is the most prominent method for managing the identified risks. Finally it is concluded that there is a correlation between insured sum and actual replacement cost when there are losses or damages. However, the insurance claims settled could cater for only 61.1% of the replacement cost of on-going construction works studied.

Suggested Citation

  • Henry Odeyinka, 2000. "An evaluation of the use of insurance in managing construction risks," Construction Management and Economics, Taylor & Francis Journals, vol. 18(5), pages 519-524.
  • Handle: RePEc:taf:conmgt:v:18:y:2000:i:5:p:519-524
    DOI: 10.1080/014461900407329
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/014461900407329
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461900407329?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sanghyo Lee & Kyunghwan Kim, 2015. "Collar Option Model for Managing the Cost Overrun Caused by Change Orders," Sustainability, MDPI, vol. 7(8), pages 1-15, August.
    2. Sang-Guk Yum & Sungjin Ahn & Junseo Bae & Ji-Myong Kim, 2020. "Assessing the Risk of Natural Disaster-Induced Losses to Tunnel-Construction Projects Using Empirical Financial-Loss Data from South Korea," Sustainability, MDPI, vol. 12(19), pages 1-15, September.
    3. Ji-Myong Kim & Kag-Cheon Ha & Sungjin Ahn & Seunghyun Son & Kiyoung Son, 2020. "Quantifying the Third-Party Loss in Building Construction Sites Utilizing Claims Payouts: A Case Study in South Korea," Sustainability, MDPI, vol. 12(23), pages 1-13, December.
    4. Sungjin Ahn & Taehui Kim & Ji-Myong Kim, 2020. "Sustainable Risk Assessment through the Analysis of Financial Losses from Third-Party Damage in Bridge Construction," Sustainability, MDPI, vol. 12(8), pages 1-15, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:18:y:2000:i:5:p:519-524. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.