IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v16y1998i3p315-325.html
   My bibliography  Save this article

Planning and control processes and techniques for refurbishment management

Author

Listed:
  • Charles Egbu
  • Barbara Young
  • Victor Torrance

Abstract

Using a case study approach involving four refurbishment projects from both the construction and shipping industries (hospital, warship, hotel and passenger ship), 36 semi-structured interviews with key functionaries from both sectors and 49 completed postal questionnaires, this paper attempts to shed light on the function of planning and control by examining the various systems, methods and techniques associated with refurbishment management in both industries. The conclusion is that there is a substantially longer planning lead time in the ship refurbishment sector than in construction. The state of completion of design before refurbishment work commences is higher in the shipping industry. Site managers from the ship refurbishment sector are brought into the planning and control processes earlier than their counterparts from the construction industry. In both industries, however, schedules and bar charts are the most frequently used formal planning techniques, in comparison with computer based techniques such as PERT, GERT and expert systems; the main reasons being familiarity, the relatively low levels of skill and knowledge needed to understand them as much as their perceived flexibility and relative cheapness for their production and updating. Planning and control involving the management of risks and uncertainty by improving the quality and timing of relevant information for the works, and the timely integration of key functionaries in the refurbishment process, help to improve planning accuracy and effectiveness.

Suggested Citation

  • Charles Egbu & Barbara Young & Victor Torrance, 1998. "Planning and control processes and techniques for refurbishment management," Construction Management and Economics, Taylor & Francis Journals, vol. 16(3), pages 315-325.
  • Handle: RePEc:taf:conmgt:v:16:y:1998:i:3:p:315-325
    DOI: 10.1080/014461998372349
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/014461998372349
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461998372349?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Li, Mei & Yang, Jay, 2014. "Critical factors for waste management in office building retrofit projects in Australia," Resources, Conservation & Recycling, Elsevier, vol. 93(C), pages 85-98.

    More about this item

    Keywords

    Control; Planning; Refurbishment;
    All these keywords.

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:16:y:1998:i:3:p:315-325. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.