IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v16y1998i2p131-137.html
   My bibliography  Save this article

The role of logistics in the materials flow control process

Author

Listed:
  • A. Agapiou
  • L. E. Clausen
  • R. Flanagan
  • G. Norman
  • D. Notman

Abstract

Frequently, the supply of building materials to the construction site is fraught with difficulties which can have a significant effect on productivity. Major productivity gains are possible, particularly if the building process is planned from a logistics perspective. The concept of logistics was developed initially within the manufacturing industry, and now constitutes an important management tool to ensure an overall strategic perspective on the flow of materials in the production process. This paper contends that logistics are relevant also to the construction industry, and describes the development of a logistics model to manage the flow of materials from suppliers to installation on-site and its application to a Danish house building project. The case study evidence suggests that the primary focus of the logistics concept in construction is to improve coordination and communication between project participants during the design and construction phases, particularly in the materials flow control process. The logistics concept requires accurate scheduling of materials to programmed delivery dates keyed to actual site layout and storage arrangements. The logistics approach also involves a new role for materials suppliers, including early involvement in the design phase and overall responsibility for the flow of information relating to materials.

Suggested Citation

  • A. Agapiou & L. E. Clausen & R. Flanagan & G. Norman & D. Notman, 1998. "The role of logistics in the materials flow control process," Construction Management and Economics, Taylor & Francis Journals, vol. 16(2), pages 131-137.
  • Handle: RePEc:taf:conmgt:v:16:y:1998:i:2:p:131-137
    DOI: 10.1080/014461998372420
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/014461998372420
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461998372420?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. R. Navon & O. Berkovich, 2006. "An automated model for materials management and control," Construction Management and Economics, Taylor & Francis Journals, vol. 24(6), pages 635-646.
    2. Bergstrom, Max & Stehn, Lars, 2005. "Matching industrialised timber frame housing needs and enterprise resource planning: A change process," International Journal of Production Economics, Elsevier, vol. 97(2), pages 172-184, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:16:y:1998:i:2:p:131-137. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.