Controlling activity interval times in LOB scheduling

Author

Listed:
  • Ching-Hwang Wang
  • Yu-Chun Huang

Abstract

A new scheduling method is presented in this paper which overcomes the inability of the line of balance (LOB) method to control the interval times between adjacent activities in a repetitive construction unit. The interval times are analysed and then expressed as functions of the number of repetitive construction units, the difference between construction times of adjacent activities and the sequence of repetitive construction units. In order to overcome the LOB problem, this paper presents a new scheduling method, the multistage linear scheduling (MLS) method, based on the concept of a multistage decision process. With the MLS method, the project's completion time is smaller or equal to that estimated with the LOB method. The sum of construction times of each activity in all units is the same as that estimated with the LOB method. However, no interval times are generated. The adjacent activities in a repetitive construction unit can progress continuously (not allowed under the LOB method). Therefore, the MLS method can be used to schedule a repetitive project which has necessary practical constraints on the interval times. This results in the retention of construction quality, safety and efficiency.

Suggested Citation

  • Ching-Hwang Wang & Yu-Chun Huang, 1998. "Controlling activity interval times in LOB scheduling," Construction Management and Economics, Taylor & Francis Journals, vol. 16(1), pages 5-16.
  • Handle: RePEc:taf:conmgt:v:16:y:1998:i:1:p:5-16
    DOI: 10.1080/014461998372547
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/014461998372547
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461998372547?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Onur Tokdemir & David Arditi & Cenk Balcik, 2006. "ALISS: Advanced Linear Scheduling System," Construction Management and Economics, Taylor & Francis Journals, vol. 24(12), pages 1253-1267.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:16:y:1998:i:1:p:5-16. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.