Author
Listed:
- Allen F. Isaacman
- Barbara S. Isaacman
Abstract
In 1969, Portugal and South Africa signed an agreement that enabled the apartheid regime effectively to extend its tentacles of empire over the proposed dam at Cahora Bassa. Located in the heart of central Mozambique, far from the South African frontier, the dam became a security project masked as a development initiative. Cahora Bassa, including the massive lake behind the dam, rather than becoming the multi-purpose dam originally envisaged by Portuguese planners, was transformed into a strategic security project designed to blunt the advance into southern Mozambique of the liberation movement the Frente de Libertação de Moçambique (Frelimo) and, by extension, its ally the African National Congress (ANC). In this way, the colonial regime and its apartheid ally hoped to prevent attacks against Mozambique's major colonial urban areas of Beira and Lourenço Marques. From Pretoria's perspective, it was preferable to fight the ANC in central Mozambique rather than along the Limpopo river – southern Mozambique's frontier with South Africa. The hydro-electric project at Cahora Bassa also ensured South Africa's energy security. The 1969 agreement guaranteed that 82 per cent of the electricity generated there would be exported to South Africa at well below the world price.This article examines the vital role played by South African interests in financing, constructing, and defending the dam site at Songo, which resulted in the dam's deterritorialisation and allowed South Africa to incorporate Cahora Bassa as an outpost of empire. It also explores the ways in which Pretoria held the dam hostage after Mozambique became independent, as part of a broader process of destabilising its socialist neighbour to the north. Even after the dismantling of the apartheid regime in 1994, the new ANC-led government resisted efforts to abrogate the colonial agreement, and Songo remained a foreign enclave. Although Mozambique regained sovereignty over the dam site in 2007, even today, most of the electricity generated by Cahora Bassa is exported to South Africa, at a price that remains a state secret.
Suggested Citation
Allen F. Isaacman & Barbara S. Isaacman, 2015.
"Extending South Africa's Tentacles of Empire: The Deterritorialisation of Cahora Bassa Dam,"
Journal of Southern African Studies, Taylor & Francis Journals, vol. 41(3), pages 541-560, May.
Handle:
RePEc:taf:cjssxx:v:41:y:2015:i:3:p:541-560
DOI: 10.1080/03057070.2015.1039408
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:cjssxx:v:41:y:2015:i:3:p:541-560. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/cjss .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.