IDEAS home Printed from https://ideas.repec.org/a/spr/opmare/v18y2025i1d10.1007_s12063-024-00532-x.html
   My bibliography  Save this article

Project portfolio selection and scheduling problem under material supply uncertainty

Author

Listed:
  • Farhad Habibi

    (University of New South Wales)

  • Ripon Kumar Chakrabortty

    (University of New South Wales)

  • Tom Servranckx

    (Ghent University)

  • Alireza Abbasi

    (University of New South Wales)

  • Mario Vanhoucke

    (Ghent University
    Operations and Technology Management Centre, Vlerick Business School
    UCL School of Management, University College London)

Abstract

Integrated decision-making across project portfolio selection, scheduling, and material ordering is essential to avoid suboptimal outcomes, including delays, cost overruns, and missed opportunities. However, existing literature overlooks this integration, as well as the significant impact of uncertainty in material supply on decision-making processes. To address these gaps, we propose a robust methodology for integrating these aspects while accounting for uncertainties in material supply. Initially, we present a deterministic optimization model that integrates key decisions of project portfolio selection, project scheduling, and material ordering to maximize the net present value (NPV). We then enhanced this approach by incorporating various sources of uncertainty in material supply, resulting in a robust model. Given the NP-hard nature of the problem, a modified genetic algorithm was employed to solve it efficiently for larger sizes. Results demonstrate that the modified genetic algorithm enhances computational efficiency while maintaining solution quality compared to exact methods. Specifically, it reduces solution time by over 90% for medium-scale problems with an optimality gap of 1%. Implemented on a road construction project in Australia, sensitivity analysis highlights the pivotal role of supplier capacity in project profitability. A potential 20% increase in capacity correlates with a notable 32% increase in NPV, underlining the importance of considering uncertainty in this parameter. Findings demonstrate that the proposed robust approach ensures feasibility and high-quality solutions across various scenarios, offering decision-makers confidence in unpredictable conditions. This study provides a practical roadmap for integrating decision-making processes and managing uncertainty in project management, enhancing adaptability in dynamic environments.

Suggested Citation

  • Farhad Habibi & Ripon Kumar Chakrabortty & Tom Servranckx & Alireza Abbasi & Mario Vanhoucke, 2025. "Project portfolio selection and scheduling problem under material supply uncertainty," Operations Management Research, Springer, vol. 18(1), pages 226-256, March.
  • Handle: RePEc:spr:opmare:v:18:y:2025:i:1:d:10.1007_s12063-024-00532-x
    DOI: 10.1007/s12063-024-00532-x
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12063-024-00532-x
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12063-024-00532-x?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opmare:v:18:y:2025:i:1:d:10.1007_s12063-024-00532-x. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.