Abstract
Two-phase closed thermosyphon (TPCT) is widely used to cool foundation soil and improve the stability of structures in cold regions. However, along with the cooling of soil surrounding a TPCT, frost heaving of soil can occur, which might pull the structures out, but this phenomenon has rarely been reported. In this paper, based on field observations along the Qinghai–Tibet power transmission line, we present a case study on the frost jacking of piles, with the largest jacking amount being up to 65 mm from December 2011 to November 2018, because of the application of TPCTs. Owing to a greatly enlarged frozen section around the piles due to the cooling of TPCTs, moisture migration toward and frost heaving around the pile were greatly intensified. This resulted in an obvious increase in the tangential frost heaving force and a decrease in the anti-frost jacking force. Thus, the pile might be jacked out from the ground. In areas with shallow developed artesian ground water, the frost jacking of the pile with TPCTs was determined to be more probable because the tangential frost heaving force will be greatly increased. The influence of the decreasing efficiency, or even the failure of TPCTs applied in engineering structures, might give rise to the development of differential deformation, threatening the stability of the tower on the piles. The results indicate that the application of TPCTs for engineering in talik or seasonally frozen areas should be more careful and increasing concern should be given for the engineering influence of TPCT failure.
Suggested Citation
Lei Guo & Qihao Yu & Na Yin & Yanhui You & Jinchang Wang & Yongning Sun & Kun Chen, 2024.
"Two-phase closed thermosyphon-induced frost jacking of piles and foundation instability in a thawed permafrost area,"
Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, Springer;International Society for the Prevention and Mitigation of Natural Hazards, vol. 120(1), pages 619-637, January.
Handle:
RePEc:spr:nathaz:v:120:y:2024:i:1:d:10.1007_s11069-023-06169-6
DOI: 10.1007/s11069-023-06169-6
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:nathaz:v:120:y:2024:i:1:d:10.1007_s11069-023-06169-6. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.