IDEAS home Printed from https://ideas.repec.org/a/spr/joptap/v151y2011i1d10.1007_s10957-011-9855-x.html
   My bibliography  Save this article

On Optimality of a Class of Dynamic Myopic Policies for Continuous-Time Replenishment with Periodic Updates

Author

Listed:
  • Konstantin Kogan

    (Bar-Ilan University)

  • Matan Shnaiderman

    (Bar-Ilan University)

Abstract

This paper is motivated by inventory problems arising in supply chains characterized by continuous replenishment programs based on information exchanged (reviewed) only intermittently between a manufacturing system (supplier) and a customer (retailer). When the replenishment is once-per-period, rather than at any point of time, a well-known result is the optimality of the so-called myopic base-stock policy. We generalize the notion of the base-stock policy and study the optimality of the corresponding class of dynamic myopic policies. We identify a myopic policy and prove that although the replenishment rule is dynamic, this policy is optimal when the demands are stationary and the number of review periods tends to infinity.

Suggested Citation

  • Konstantin Kogan & Matan Shnaiderman, 2011. "On Optimality of a Class of Dynamic Myopic Policies for Continuous-Time Replenishment with Periodic Updates," Journal of Optimization Theory and Applications, Springer, vol. 151(1), pages 191-209, October.
  • Handle: RePEc:spr:joptap:v:151:y:2011:i:1:d:10.1007_s10957-011-9855-x
    DOI: 10.1007/s10957-011-9855-x
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10957-011-9855-x
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10957-011-9855-x?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Michael J. Fry & Roman Kapuscinski & Tava Lennon Olsen, 2001. "Coordinating Production and Delivery Under a (z, Z)-Type Vendor-Managed Inventory Contract," Manufacturing & Service Operations Management, INFORMS, vol. 3(2), pages 151-173, August.
    2. Seçil Savaşaneril & Nesim Erkip, 2010. "An analysis of manufacturer benefits under vendor-managed systems," IISE Transactions, Taylor & Francis Journals, vol. 42(7), pages 455-477.
    3. Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
    4. Uday S. Rao, 2003. "Properties of the Periodic Review (R, T) Inventory Control Policy for Stationary, Stochastic Demand," Manufacturing & Service Operations Management, INFORMS, vol. 5(1), pages 37-53, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sainathan, Arvind & Groenevelt, Harry, 2019. "Vendor managed inventory contracts – coordinating the supply chain while looking from the vendor’s perspective," European Journal of Operational Research, Elsevier, vol. 272(1), pages 249-260.
    2. Yu, Haiyan & Tang, Linglang & Xu, Yinfeng & Wang, Yong, 2015. "How much does VMI better than RMI in a global environment?," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 268-274.
    3. Weißhuhn, Sandria & Hoberg, Kai, 2021. "Designing smart replenishment systems: Internet-of-Things technology for vendor-managed inventory at end consumers," European Journal of Operational Research, Elsevier, vol. 295(3), pages 949-964.
    4. Lee, Jun-Yeon & Cho, Richard K., 2014. "Contracting for vendor-managed inventory with consignment stock and stockout-cost sharing," International Journal of Production Economics, Elsevier, vol. 151(C), pages 158-173.
    5. Taleizadeh, Ata Allah & Tafakkori, Keivan & Thaichon, Park, 2021. "Resilience toward supply disruptions: A stochastic inventory control model with partial backordering under the base stock policy," Journal of Retailing and Consumer Services, Elsevier, vol. 58(C).
    6. Choudhary, Devendra & Shankar, Ravi, 2015. "The value of VMI beyond information sharing in a single supplier multiple retailers supply chain under a non-stationary (Rn, Sn) policy," Omega, Elsevier, vol. 51(C), pages 59-70.
    7. Lee, Jun-Yeon & Ren, Louie, 2011. "Vendor-managed inventory in a global environment with exchange rate uncertainty," International Journal of Production Economics, Elsevier, vol. 130(2), pages 169-174, April.
    8. Voelkel, Michael A. & Sachs, Anna-Lena & Thonemann, Ulrich W., 2020. "An aggregation-based approximate dynamic programming approach for the periodic review model with random yield," European Journal of Operational Research, Elsevier, vol. 281(2), pages 286-298.
    9. Jan A. Van Mieghem & Nils Rudi, 2002. "Newsvendor Networks: Inventory Management and Capacity Investment with Discretionary Activities," Manufacturing & Service Operations Management, INFORMS, vol. 4(4), pages 313-335, August.
    10. Pham, An & Jin, Tongdan & Novoa, Clara & Qin, Jin, 2019. "A multi-site production and microgrid planning model for net-zero energy operations," International Journal of Production Economics, Elsevier, vol. 218(C), pages 260-274.
    11. Kutzner, Sarah C. & Kiesmüller, Gudrun P., 2013. "Optimal control of an inventory-production system with state-dependent random yield," European Journal of Operational Research, Elsevier, vol. 227(3), pages 444-452.
    12. Saurabh Bansal & Mahesh Nagarajan, 2017. "Product Portfolio Management with Production Flexibility in Agribusiness," Operations Research, INFORMS, vol. 65(4), pages 914-930, August.
    13. A. Dolgui & M. Kovalyov & K. Shchamialiova, 2011. "Multi-product lot-sizing and sequencing on a single imperfect machine," Computational Optimization and Applications, Springer, vol. 50(3), pages 465-482, December.
    14. Gullu, Refik, 1998. "Base stock policies for production/inventory problems with uncertain capacity levels," European Journal of Operational Research, Elsevier, vol. 105(1), pages 43-51, February.
    15. Woonghee Tim Huh & Mahesh Nagarajan, 2010. "Technical note ---Linear Inflation Rules for the Random Yield Problem: Analysis and Computations," Operations Research, INFORMS, vol. 58(1), pages 244-251, February.
    16. Kevin H. Shang & Sean X. Zhou & Geert-Jan van Houtum, 2010. "Improving Supply Chain Performance: Real-Time Demand Information and Flexible Deliveries," Manufacturing & Service Operations Management, INFORMS, vol. 12(3), pages 430-448, May.
    17. E A Silver, 2004. "An overview of heuristic solution methods," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(9), pages 936-956, September.
    18. Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
    19. Metzker Soares, Paula & Thevenin, Simon & Adulyasak, Yossiri & Dolgui, Alexandre, 2024. "Adaptive robust optimization for lot-sizing under yield uncertainty," European Journal of Operational Research, Elsevier, vol. 313(2), pages 513-526.
    20. Guo Li & Mengqi Liu & Xu Guan, 2017. "Diversity of payment contracts in a decentralized assembly system," Annals of Operations Research, Springer, vol. 257(1), pages 613-639, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joptap:v:151:y:2011:i:1:d:10.1007_s10957-011-9855-x. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.