Abstract
All engineering projects involve risk management applications. Sometimes, risks cannot be effectively managed, leading to catastrophic consequences. Engineers must consciously or unconsciously manage these risks. Regardless of how risks are handled, project risks need to be systematically evaluated. Therefore, risk management procedures must be implemented in every project, particularly in geo-engineering projects, to mitigate undesirable consequences and achieve project objectives. However, the use of risk management procedures in underground excavation projects is not common. Numerous commonly employed underground excavation techniques lack assessment of risks, notably geotechnical risks. Most of them only evaluate rock structures and excavation stability in accordance with the geological structure. This paper combines a universal risk management perspective with the underground engineering discipline. The tunnel engineering design and construction steps were evaluated for uncertainties using Scenario Structuring Modeling techniques to identify both technical and non-technical risks associated with underground excavation. Bayesian Network models were employed to identify connections that contribute to risk. To achieve this, objective and quantitative risk assessment tables have been devised using risk management philosophy, in accordance with tunnel design engineering principles and Turkish procurement laws. The primary objective of this study is to increase awareness of the use of risk management processes in tunnel construction projects and introduce a systematic approach to risk assessment in tunnel engineering projects. As a result, a semi-quantitative risk assessment method based on risk management philosophy is proposed for tunnel design and construction for the first time, evaluating not only geotechnical and engineering risks but also human, financial, and various other sources of risks.
Suggested Citation
Ozgur Satici & Esra Satici, 2024.
"Theoretical semi-quantitative risk assessment methodology for tunnel design and construction processes,"
International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 15(7), pages 3385-3405, July.
Handle:
RePEc:spr:ijsaem:v:15:y:2024:i:7:d:10.1007_s13198-024-02348-1
DOI: 10.1007/s13198-024-02348-1
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ijsaem:v:15:y:2024:i:7:d:10.1007_s13198-024-02348-1. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.