IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v92y1999i0p87-10510.1023-a1018959420252.html
   My bibliography  Save this article

Scheduling multi‐operation jobs on a single machine

Author

Listed:
  • A.E. Gerodimos
  • C.A. Glass
  • C.N. Potts
  • T. Tautenhahn

Abstract

We consider the problem of scheduling n multi‐operationjobs on a single machine. Eachjob comprises up to F operations that belong to different families.Changeovers of production from one family to another have associated set‐up times.A job completes when all of its operations have been processed. This type of problem arisesin the manufacture of food products. It combines the batching aspect of the well‐knownfamily scheduling models with an assembly element (where the job's operationsare assembled to make the final product).Our analysis covers three classic optimality criteria: the maximum lateness, theweighted number of late jobs, and the sum of job completion times. We show that the problemof minimizing the maximum lateness is equivalent to its counterpart without assembly.This enables us to derive extensions of known complexity results and to indicate appropriatealgorithms. The number of late jobs problem is shown to be binary NP‐hard when thereare two families, and unary NP‐hard when there are an arbitrary number of families,even when all set‐up times are identical. For a fixed number of families, we give adynamic programming algorithm to minimize the weighted number of late jobs, which requirespseudo‐polynomial running time. A similar algorithm solves the sum of completion timesproblem in polynomial time, under the additional assumption that the processing times ofoperations between families are agreeable. Copyright Kluwer Academic Publishers 1999

Suggested Citation

  • A.E. Gerodimos & C.A. Glass & C.N. Potts & T. Tautenhahn, 1999. "Scheduling multi‐operation jobs on a single machine," Annals of Operations Research, Springer, vol. 92(0), pages 87-105, January.
  • Handle: RePEc:spr:annopr:v:92:y:1999:i:0:p:87-105:10.1023/a:1018959420252
    DOI: 10.1023/A:1018959420252
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1023/A:1018959420252
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1023/A:1018959420252?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    2. Mecler, Davi & Abu-Marrul, Victor & Martinelli, Rafael & Hoff, Arild, 2022. "Iterated greedy algorithms for a complex parallel machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 300(2), pages 545-560.
    3. Leung, Joseph Y.-T. & Lee, C.Y. & Ng, C.W. & Young, G.H., 2008. "Preemptive multiprocessor order scheduling to minimize total weighted flowtime," European Journal of Operational Research, Elsevier, vol. 190(1), pages 40-51, October.
    4. Dominik Kress & Maksim Barketau & Erwin Pesch, 2018. "Single-machine batch scheduling to minimize the total setup cost in the presence of deadlines," Journal of Scheduling, Springer, vol. 21(6), pages 595-606, December.
    5. F. Hwang & M. Kovalyov & B. Lin, 2014. "Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence," Annals of Operations Research, Springer, vol. 217(1), pages 263-279, June.
    6. Framinan, Jose M. & Perez-Gonzalez, Paz & Fernandez-Viagas, Victor, 2019. "Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures," European Journal of Operational Research, Elsevier, vol. 273(2), pages 401-417.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:92:y:1999:i:0:p:87-105:10.1023/a:1018959420252. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.