Author
Listed:
- Weidong Lei
(Xi’an University of Science and Technology)
- Liu Yang
(University of Electronic Science and Technology of China)
- Pengyu Yan
(University of Electronic Science and Technology of China)
- Chengbin Chu
(University Gustave Eiffel, ESIEE Paris, COSYS-GRETTIA)
- Jie Yang
(University of Electronic Science and Technology of China)
Abstract
This paper presents a bi-objective solution approach to address the production scheduling challenge encountered by manufacturers in a shared manufacturing environment. In such scenarios, manufacturers are required to manage orders received through a cloud platform (referred to as cloud orders) while simultaneously fulfilling orders from their long-term and regular clients (local orders). The problem is to efficiently coordinate the production of both types of orders within shared manufacturing facilities. We formulate the problem into a bi-objective mixed integer programming model aimed at simultaneously minimizing the delivery time of cloud orders and mitigating the disruptions to local order production caused by cloud orders. This solution approach comprises three key components: computation of cloud orders’ starting times, construction of available time intervals of manufacturing facilities, and a bi-objective heuristic. This heuristic combines an enhanced hybrid discrete differential evolution with a modified forward–backward earliest starting time algorithm. We introduce an advanced population initialization technique, a novel individual update strategy, and an adaptive local search mechanism based on Pareto-dominance principles to improve the search capabilities of the algorithm towards discovering Pareto non-dominated solutions. Computational results show that the proposed approach outperforms the existing algorithm in most test instances in terms of five common metrics. Insights are discussed, highlighting the practical implications and potential benefits of the proposed approach for shared manufacturing scheduling.
Suggested Citation
Weidong Lei & Liu Yang & Pengyu Yan & Chengbin Chu & Jie Yang, 2025.
"Production coordination of local and cloud orders in shared manufacturing: a bi-objective pre-scheduling approach,"
Annals of Operations Research, Springer, vol. 345(1), pages 207-245, February.
Handle:
RePEc:spr:annopr:v:345:y:2025:i:1:d:10.1007_s10479-024-06380-z
DOI: 10.1007/s10479-024-06380-z
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:345:y:2025:i:1:d:10.1007_s10479-024-06380-z. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.