Author
Listed:
- Zhixuan Lai
(East China University of Science and Technology)
- Gaoxiang Lou
(East China University of Science and Technology)
- Tiantian Zhang
(Nottingham University Business School China, University of Nottingham Ningbo China)
- Tijun Fan
(East China University of Science and Technology)
Abstract
Green product development depends on the green innovation behavior of upstream and downstream companies in the supply chain. This paper focuses on a green supply chain consisting of a supplier and a manufacturer and considers two financing schemes wherein the manufacturer’s operating capital and green innovation capital are both constrained: bank credit financing (BCF) and supplier green investment (SGI). We investigate the financing strategy of a manufacturer with different financing decision preferences and supply chain coordination contract designs. The results show that when the manufacturer’s financing decision preference is low bankruptcy risk, it should choose BCF when the bank loan interest rate is lower than a threshold and SGI when the bank loan interest rate is higher than this threshold; when the manufacturer’s financing decision preference is high R&D benefit, it should choose BCF when the initial capital is lower than another threshold and choose SGI when the initial capital is higher than this threshold. Then, we compare whether cost-sharing, quantity discount and revenue-sharing contracts can coordinate the supply chain, and discuss the selection strategies of supply chain members for coordination contracts. Research shows that revenue-sharing contracts fail to coordinate; however, when the cost-sharing ratio and quantity discount rate are appropriate, both cost-sharing and quantity discount contracts can achieve supply chain coordination. The lower the supplier’s unit production cost, the stronger its motivation to accept a higher cost-sharing ratio and quantity discount rate. For the supplier, the key to choosing any coordination contract lies in the relative height of the cost-sharing ratio and quantity discount rate while the manufacturer should always choose a quantity discount contract when the quantity discount rate is high enough.
Suggested Citation
Zhixuan Lai & Gaoxiang Lou & Tiantian Zhang & Tijun Fan, 2023.
"Financing and coordination strategies for a manufacturer with limited operating and green innovation capital: bank credit financing versus supplier green investment,"
Annals of Operations Research, Springer, vol. 331(1), pages 85-119, December.
Handle:
RePEc:spr:annopr:v:331:y:2023:i:1:d:10.1007_s10479-021-04098-w
DOI: 10.1007/s10479-021-04098-w
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:331:y:2023:i:1:d:10.1007_s10479-021-04098-w. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.