IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v125y2004i1p233-26110.1023-banor.0000011193.32585.a8.html
   My bibliography  Save this article

Optimal Control of Failure-Prone Manufacturing Systems with Constant Repair Times

Author

Listed:
  • James Perkins

Abstract

This paper considers a failure-prone manufacturing system with exponentially distributed operational times and constant repair times. Under the hedging-point policy, the steady-state probability density function of the buffer level is determined. The optimality of the hedging-point policy for this problem is proven, and analytical expressions for the computation of the optimal hedging point are determined. It is also shown that the optimal hedging point for the system with constant repair times provides a lower bound for the optimal hedging point for any other independent, identically distributed (iid) repair time sequence having the same mean. Using a queueing equivalence, an expression is derived for determining the optimal hedging point for any iid repair time sequence. Copyright Kluwer Academic Publishers 2004

Suggested Citation

  • James Perkins, 2004. "Optimal Control of Failure-Prone Manufacturing Systems with Constant Repair Times," Annals of Operations Research, Springer, vol. 125(1), pages 233-261, January.
  • Handle: RePEc:spr:annopr:v:125:y:2004:i:1:p:233-261:10.1023/b:anor.0000011193.32585.a8
    DOI: 10.1023/B:ANOR.0000011193.32585.a8
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1023/B:ANOR.0000011193.32585.a8
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1023/B:ANOR.0000011193.32585.a8?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Corominas, Albert & Pastor, Rafael, 2009. "Scheduling production of multiple part-types in a system with pre-known demands and deterministic inactive time intervals," European Journal of Operational Research, Elsevier, vol. 193(2), pages 639-643, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:125:y:2004:i:1:p:233-261:10.1023/b:anor.0000011193.32585.a8. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.