Factors Influencing The Choice Of Cost Estimates Types And The Accuracy Of Estimates For Construction Projects

Author

Listed:
  • Cezar SIMION-MELINTE

Abstract

In this paper were analyzed, based on a research methodology, relations between the factors that determine what types of cost estimates of construction projects and approaches used in making cost estimates. The analysis made led to the confirmation of two research hypotheses: a strong positive correlation between the professional experience of project managers and the use of top-down approaches in the cost estimates of construction projects; a strong positive correlation between time and resources allocated for estimation and using parametric estimates. A second analysis is performed to estimate the relationship between the type of estimates used and accuracy of the estimate, confirmed for the three types of estimates: analogous, parametric and definitive. It has not been confirmed a significant relationship between the level of education of project managers and using bottom-up approaches, cost estimates of construction projects.

Suggested Citation

  • Cezar SIMION-MELINTE, 2016. "Factors Influencing The Choice Of Cost Estimates Types And The Accuracy Of Estimates For Construction Projects," Proceedings of the INTERNATIONAL MANAGEMENT CONFERENCE, Faculty of Management, Academy of Economic Studies, Bucharest, Romania, vol. 10(1), pages 50-56, November.
  • Handle: RePEc:rom:mancon:v:10:y:2016:i:1:p:50-56
    as

    Download full text from publisher

    File URL: https://conference.management.ase.ro/archives/2016/PDF/1_6.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Ajibade Ayodeji Aibinu & Thomas Pasco, 2008. "The accuracy of pre-tender building cost estimates in Australia," Construction Management and Economics, Taylor & Francis Journals, vol. 26(12), pages 1257-1269.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Miranda Sarmento, J.J. & Renneboog, Luc, 2017. "Cost overruns in public sector investment projects," Other publications TiSEM 51799a3e-4c78-4dbd-b330-b, Tilburg University, School of Economics and Management.
    2. Igor Peško & Vladimir Mučenski & Miloš Šešlija & Nebojša Radović & Aleksandra Vujkov & Dragana Bibić & Milena Krklješ, 2017. "Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM," Complexity, Hindawi, vol. 2017, pages 1-13, December.
    3. Tomáš Bruckner & Filip Vencovský, 2020. "The Process of Unit Price Extraction from Public Sector Contracts," Acta Informatica Pragensia, Prague University of Economics and Business, vol. 2020(2), pages 170-183.
    4. Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.
    5. Tomáš Bruckner & Filip Vencovský, . "The Process of Unit Price Extraction from Public Sector Contracts," Acta Informatica Pragensia, Prague University of Economics and Business, vol. 0.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:rom:mancon:v:10:y:2016:i:1:p:50-56. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ciocoiu Nadia Carmen (email available below). General contact details of provider: https://edirc.repec.org/data/mnasero.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.