- Karuga Rwamba
(Department of Management Science, Kenyatta University, Nairobi, Kenya)
- Morrisson Mutuku
(Department of Management Science, Kenyatta University, Nairobi, Kenya)
- Paul Sang
(Department of Management Science, Kenyatta University, Nairobi, Kenya)
Abstract
Kenya has seen a boom in road building during the last couple of years as a result of the government's significant investments in the construction industry to upgrade infrastructure, such as road networks. Road network construction is one of the key pillar of the country long term vision 2030. However, the performance of the road projects has experienced various challenges leaving some roads uncompleted, others poorly done after huge investment of public resources. This study sought to evaluate the influence of financial resources scheduling on the performance of road construction projects in Nairobi Metropolitan, Kenya. The research was based on resource dependence theory. A descriptive design as well as the cross-sectional survey was used. The population of interest for this study consisted of 39 road construction projects being implemented by Kenya Urban Roads Authority and Kenya National Highway Authority within the Nairobi metropolitan area. A semi structured questionnaire was utilized to collect primary data. The quantitative data was analyzed using descriptive and inferential statistics. The study results revealed projects resource scheduling had a positive and significant effect on project performance of road construction projects in Nairobi Metropolitan, Kenya. The study concludes that effective financial resource scheduling enables that organization to manage risk that may occur from changes in the project’s outcome. Financial resource scheduling starts from developing the project budget which is a process for allocating administered and departmental funds necessary to build a financial foundation for producing stated project deliverables. Key Words:Financial, Resources, Scheduling, Road, Project, Performance, Kenya
Suggested Citation
Karuga Rwamba & Morrisson Mutuku & Paul Sang, 2024.
"Financial resource scheduling and road construction projects performance in Nairobi Metropolitan, Kenya,"
International Journal of Research in Business and Social Science (2147-4478), Center for the Strategic Studies in Business and Finance, vol. 13(4), pages 223-229, June.
Handle:
RePEc:rbs:ijbrss:v:13:y:2024:i:4:p:223-229
DOI: 10.20525/ijrbs.v13i4.3345
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:rbs:ijbrss:v:13:y:2024:i:4:p:223-229. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Umit Hacioglu (email available below). General contact details of provider: https://edirc.repec.org/data/ssbffea.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.