Construction project risk prediction model based on EW-FAHP and one dimensional convolution neural network

Author

Listed:
  • Yawen Zhong
  • Hailing Li
  • Leilei Chen

Abstract

In order to solve the problem of low accuracy of traditional construction project risk prediction, a project risk prediction model based on EW-FAHP and 1D-CNN(One Dimensional Convolution Neural Network) is proposed. Firstly, the risk evaluation index value of construction project is selected by literature analysis method, and the comprehensive weight of risk index is obtained by combining entropy weight method (EW) and fuzzy analytic hierarchy process (FAHP). The risk weight is input into the 1D-CNN model for training and learning, and the prediction values of construction period risk and cost risk are output to realize the risk prediction. The experimental results show that the average absolute error of the construction period risk and cost risk of the risk prediction model proposed in this paper is below 0.1%, which can meet the risk prediction of construction projects with high accuracy.

Suggested Citation

  • Yawen Zhong & Hailing Li & Leilei Chen, 2021. "Construction project risk prediction model based on EW-FAHP and one dimensional convolution neural network," PLOS ONE, Public Library of Science, vol. 16(2), pages 1-20, February.
  • Handle: RePEc:plo:pone00:0246539
    DOI: 10.1371/journal.pone.0246539
    as

    Download full text from publisher

    File URL: https://journals.plos.org/plosone/article?id=10.1371/journal.pone.0246539
    Download Restriction: no

    File URL: https://journals.plos.org/plosone/article/file?id=10.1371/journal.pone.0246539&type=printable
    Download Restriction: no

    File URL: https://libkey.io/10.1371/journal.pone.0246539?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jianghong Feng, 2022. "An integrated multi-criteria decision-making method for hazardous waste disposal site selection," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 24(6), pages 8039-8070, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0246539. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.