Single machine scheduling with time deteriorating job values
Author
Abstract
Suggested Citation
DOI: 10.1057/palgrave.jors.2602303
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Voutsinas, Theodore G. & Pappis, Costas P., 2002. "Scheduling jobs with values exponentially deteriorating over time," International Journal of Production Economics, Elsevier, vol. 79(3), pages 163-169, October.
- Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
- Sanjeev Swami & Jehoshua Eliashberg & Charles B. Weinberg, 1999. "SilverScreener: A Modeling Approach to Movie Screens Management," Marketing Science, INFORMS, vol. 18(3), pages 352-372.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Raut, Sumit & Swami, Sanjeev & Gupta, Jatinder N.D., 2008. "Scheduling a capacitated single machine with time deteriorating job values," International Journal of Production Economics, Elsevier, vol. 114(2), pages 769-780, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sanjeev Swami, 2006. "—Research Perspectives at the Interface of Marketing and Operations: Applications to the Motion Picture Industry," Marketing Science, INFORMS, vol. 25(6), pages 670-673, 11-12.
- Raut, Sumit & Swami, Sanjeev & Gupta, Jatinder N.D., 2008. "Scheduling a capacitated single machine with time deteriorating job values," International Journal of Production Economics, Elsevier, vol. 114(2), pages 769-780, August.
- Kumar, V.N.S.A. & Kumar, V. & Brady, M. & Garza-Reyes, Jose Arturo & Simpson, M., 2017. "Resolving forward-reverse logistics multi-period model using evolutionary algorithms," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 458-469.
- Sumit Raut & Sanjeev Swami & Eunkyu Lee & Charles B. Weinberg, 2008. "How Complex Do Movie Channel Contracts Need to Be?," Marketing Science, INFORMS, vol. 27(4), pages 627-641, 07-08.
- Özceylan, Eren & Paksoy, Turan & Bektaş, Tolga, 2014. "Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 61(C), pages 142-164.
- Zhiguo Wang & Lufei Huang & Cici Xiao He, 2021. "A multi-objective and multi-period optimization model for urban healthcare waste’s reverse logistics network design," Journal of Combinatorial Optimization, Springer, vol. 42(4), pages 785-812, November.
- Niknejad, A. & Petrovic, D., 2014. "Optimisation of integrated reverse logistics networks with different product recovery routes," European Journal of Operational Research, Elsevier, vol. 238(1), pages 143-154.
- Metin Türkay & Öztürk Saraçoğlu & Mehmet Can Arslan, 2016. "Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective," PLOS ONE, Public Library of Science, vol. 11(1), pages 1-18, January.
- Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
- Teunter, Ruud H. & Vlachos, Dimitrios, 2002. "On the necessity of a disposal option for returned items that can be remanufactured," International Journal of Production Economics, Elsevier, vol. 75(3), pages 257-266, February.
- Inderfurth, Karl, 2004. "Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution," International Journal of Production Economics, Elsevier, vol. 90(3), pages 325-343, August.
- De Giovanni, Pietro & Zaccour, Georges, 2014. "A two-period game of a closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 232(1), pages 22-40.
- de Brito, Marisa P. & Dekker, Rommert, 2003.
"Modelling product returns in inventory control--exploring the validity of general assumptions,"
International Journal of Production Economics, Elsevier, vol. 81(1), pages 225-241, January.
- de Brito, M.P. & Dekker, R., 2001. "Modelling product returns in inventory control - exploring the validity or general assumptions," Econometric Institute Research Papers EI 2001-27, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Gregory A. DeCroix & Jing-Sheng Song & Paul H. Zipkin, 2009. "Managing an Assemble-to-Order System with Returns," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 144-159, October.
- Wu, Chin-Chia & Lee, Wen-Chiung, 2006. "Two-machine flowshop scheduling to minimize mean flow time under linear deterioration," International Journal of Production Economics, Elsevier, vol. 103(2), pages 572-584, October.
- Brandenburg, Marcus & Govindan, Kannan & Sarkis, Joseph & Seuring, Stefan, 2014. "Quantitative models for sustainable supply chain management: Developments and directions," European Journal of Operational Research, Elsevier, vol. 233(2), pages 299-312.
- Roland Geyer & Luk N. Van Wassenhove & Atalay Atasu, 2007. "The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles," Management Science, INFORMS, vol. 53(1), pages 88-100, January.
- Shenle Pan & Chao Chen & Ray Y. Zhong, 2015. "A crowdsourcing solution to collect e-commerce reverse flows in metropolitan areas," Post-Print hal-01148227, HAL.
- Deishin Lee, 2012. "Turning Waste into By-Product," Manufacturing & Service Operations Management, INFORMS, vol. 14(1), pages 115-127, January.
- Long He & Ying Rong & Zuo‐Jun Max Shen, 2020. "Product Sourcing and Distribution Strategies under Supply Disruption and Recall Risks," Production and Operations Management, Production and Operations Management Society, vol. 29(1), pages 9-23, January.
More about this item
Keywords
movie theatre scheduling; single machine; deteriorating job values; capacity constraint; NP-hardness; heuristics; empirical results;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:59:y:2008:i:1:d:10.1057_palgrave.jors.2602303. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.