IDEAS home Printed from https://ideas.repec.org/a/ora/journl/v1y2012i1p533-547.html
   My bibliography  Save this article

Cost Measurement And Cost Management In Target Costing

Author

Listed:
  • Moisello Anna Maria

    (University of Pavia, Economics)

Abstract

Firms are coping with a competitive scenario characterized by quick changes produced by internationalization, concentration, restructuring, technological innovation processes and financial market crisis. On the one hand market enlargement have increased the number and the segmentation of customers and have raised the number of competitors, on the other hand technological innovation has reduced product life cycle. So firms have to adjust their management models to this scenario, pursuing customer satisfaction and respecting cost constraints. In a context where price is a variable fixed by the market, firms have to switch from the cost measurement logic to the cost management one, adopting target costing methodology. The target costing process is a price driven, customer oriented profit planning and cost management system. It works, in a cross functional way, from the design stage throughout all the product life cycle and it involves the entire value chain. The process implementation needs a costing methodology consistent with the cost management logic. The aim of the paper is to focus on Activity Based Costing (ABC) application to target costing process. So: - it analyzes target costing logic and phases, basing on a literary review, in order to highlight the costing needs related to this process; - it shows, through a numerical example, how to structure a flexible ABC model -characterized by the separation between variable, fixed in the short and fixed costs - that effectively supports target costing process in the cost measurement phase (drifting cost determination) and in the target cost alignment; - it points out the effectiveness of the Activity Based Costing as a model of cost measurement applicable to the supplier choice and as a support for supply cost management which have an important role in target costing process. The activity based information allows a firm to optimize the supplier choice by following the method of minimizing the total cost of ownership (TCO). Moreover the activity based analyses reveals the opportunities for rationalizing the supply related activities and containing costs and it enables the effective involvement of the supplier in the process of target costing when he provides activity based information on the costs sustained to produce the product/service: the purchaser can evaluate the impact, in terms of cost, of the activities requested of the supplier and, as a result, he has the chance to rationalize these activities by reducing their number or intensity and enables the effective involvement of the supplier in the process of target costing. The paper gives a contribution in the advancement of costing methodologies applicable to the target costing, proposing the use of a flexible model that supports the decision process according to different time horizons so that effectively supports target costing. The model is suitable for production characterized by high complexity in terms of number and intensity of activities

Suggested Citation

  • Moisello Anna Maria, 2012. "Cost Measurement And Cost Management In Target Costing," Annals of Faculty of Economics, University of Oradea, Faculty of Economics, vol. 1(1), pages 533-547, July.
  • Handle: RePEc:ora:journl:v:1:y:2012:i:1:p:533-547
    as

    Download full text from publisher

    File URL: http://anale.steconomiceuoradea.ro/volume/2012/n1/076.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Z Degraeve & F Roodhooft, 1998. "Determining sourcing strategies: a decision model based on activity and cost driver information," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 49(8), pages 781-789, August.
    2. Zeger Degraeve & Filip Roodhooft, 2000. "A Mathematical Programming Approach for Procurement Using Activity Based Costing," Journal of Business Finance & Accounting, Wiley Blackwell, vol. 27(1&2), pages 69-98.
    3. Zeger Degraeve & Filip Roodhooft, 2000. "A Mathematical Programming Approach for Procurement Using Activity Based Costing," Journal of Business Finance & Accounting, Wiley Blackwell, vol. 27(1‐2), pages 69-98, January.
    4. Ben-Arieh, David & Qian, Li, 2003. "Activity-based cost management for design and development stage," International Journal of Production Economics, Elsevier, vol. 83(2), pages 169-183, February.
    5. Wouters, Marc & Anderson, James C. & Wynstra, Finn, 2005. "The adoption of total cost of ownership for sourcing decisions--a structural equations analysis," Accounting, Organizations and Society, Elsevier, vol. 30(2), pages 167-191, February.
    6. Patricia Everaert & Stijn Loosveld & Tom Van Acker & Marijke Schollier & Gerrit Sarens, 2006. "Characteristics of target costing: theoretical and field study perspectives," Qualitative Research in Accounting & Management, Emerald Group Publishing, vol. 3(3), pages 236-263, September.
    7. Roodhooft, Filip & Konings, Jozef, 1997. "Vendor selection and evaluation an Activity Based Costing approach," European Journal of Operational Research, Elsevier, vol. 96(1), pages 97-102, January.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Z Degraeve & F Roodhooft & B van Doveren, 2005. "The use of total cost of ownership for strategic procurement: a company-wide management information system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(1), pages 51-59, January.
    2. Jaroslaw Milczarek & Piotr Cyplik & Sebastian Wieczerniak, 2018. "Using Total Cost Of Ownership As A Method For Identification Of Internal Problems In Purchase Area – Case Study," Business Logistics in Modern Management, Josip Juraj Strossmayer University of Osijek, Faculty of Economics, Croatia, vol. 18, pages 205-223.
    3. Degraeve, Zeger & Labro, Eva & Roodhooft, Filip, 2000. "An evaluation of vendor selection models from a total cost of ownership perspective," European Journal of Operational Research, Elsevier, vol. 125(1), pages 34-58, August.
    4. Visani, Franco & Barbieri, Paolo & Di Lascio, F. Marta L. & Raffoni, Anna & Vigo, Daniele, 2016. "Supplier’s total cost of ownership evaluation: a data envelopment analysis approach," Omega, Elsevier, vol. 61(C), pages 141-154.
    5. Degraeve, Zeger & Roodhooft, Filip, 1999. "Improving the efficiency of the purchasing process using total cost of ownership information: The case of heating electrodes at Cockerill Sambre S.A," European Journal of Operational Research, Elsevier, vol. 112(1), pages 42-53, January.
    6. Liao, Zhiying & Rittscher, Jens, 2007. "Integration of supplier selection, procurement lot sizing and carrier selection under dynamic demand conditions," International Journal of Production Economics, Elsevier, vol. 107(2), pages 502-510, June.
    7. Joris van de Klundert & Jeroen Kuipers & Frits C. R. Spieksma & Maarten Winkels, 2005. "Selecting Telecommunication Carriers to Obtain Volume Discounts," Interfaces, INFORMS, vol. 35(2), pages 124-132, April.
    8. Yim, Andrew, 2010. "Quality Cost and Failure Risk in the Choice of Single versus Multiple Sourcing," MPRA Paper 27858, University Library of Munich, Germany.
    9. Maria-Victòria Sánchez-Rebull & Angels Niñerola & Ana-Beatriz Hernández-Lara, 2023. "After 30 Years, What Has Happened to Activity-Based Costing? A Systematic Literature Review," SAGE Open, , vol. 13(2), pages 21582440231, June.
    10. Z. Degraeve & Eva Labro & F. Roodhooft, 2005. "Constructing a Total Cost of Ownership supplier selection methodology based on Activity-Based Costing and mathematical programming," Accounting and Business Research, Taylor & Francis Journals, vol. 35(1), pages 3-27.
    11. Demirtas, Ezgi Aktar & Üstün, Özden, 2008. "An integrated multiobjective decision making process for supplier selection and order allocation," Omega, Elsevier, vol. 36(1), pages 76-90, February.
    12. Ekici, Ali, 2013. "An improved model for supplier selection under capacity constraint and multiple criteria," International Journal of Production Economics, Elsevier, vol. 141(2), pages 574-581.
    13. Degraeve, Zeger & Labro, Eva & Roodhooft, Filip, 2004. "Total cost of ownership purchasing of a service: The case of airline selection at Alcatel Bell," European Journal of Operational Research, Elsevier, vol. 156(1), pages 23-40, July.
    14. Amid, A. & Ghodsypour, S.H. & O'Brien, C., 2006. "Fuzzy multiobjective linear model for supplier selection in a supply chain," International Journal of Production Economics, Elsevier, vol. 104(2), pages 394-407, December.
    15. Riccardo Giannetti & Alessandro Marelli, 2016. "Il ruolo degli strumenti di cost management nello sviluppo di nuovi prodotti sostenibili," MANAGEMENT CONTROL, FrancoAngeli Editore, vol. 2016(2), pages 33-68.
    16. Andrea Bacchetti & Stefano Bonetti & Marco Perona & Nicola Saccani, 2018. "Investment and Management Decisions in Aluminium Melting: A Total Cost of Ownership Model and Practical Applications," Sustainability, MDPI, vol. 10(9), pages 1-36, September.
    17. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    18. Wouters, Marc & Anderson, James C. & Wynstra, Finn, 2005. "The adoption of total cost of ownership for sourcing decisions--a structural equations analysis," Accounting, Organizations and Society, Elsevier, vol. 30(2), pages 167-191, February.
    19. Amid, A. & Ghodsypour, S.H. & O'Brien, C., 2011. "A weighted max-min model for fuzzy multi-objective supplier selection in a supply chain," International Journal of Production Economics, Elsevier, vol. 131(1), pages 139-145, May.
    20. García Alcaraz Jorge Luis & Alvarado Iniesta Alejandro & Maldonado Macías Aidé Araceli, 2013. "Selección de proveedores basada en análisis dimensional," Contaduría y Administración, Accounting and Management, vol. 58(3), pages 249-278, julio-sep.

    More about this item

    Keywords

    Activity Based Costing; Target Costing; Total Cost of Ownership; Supplier Selection; Supply Management;
    All these keywords.

    JEL classification:

    • M - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ora:journl:v:1:y:2012:i:1:p:533-547. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catalin ZMOLE (email available below). General contact details of provider: https://edirc.repec.org/data/feoraro.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.