IDEAS home Printed from https://ideas.repec.org/a/inm/ororsc/v6y1995i2p147-167.html
   My bibliography  Save this article

Interdepartmental Interdependence and Coordination: The Case of the Design/Manufacturing Interface

Author

Listed:
  • Paul S. Adler

    (Department of Management and Organization, School of Business Administration, University of Southern California, Los Angeles, California 90089-1421)

Abstract

In contrast with the relative stability of interdepartmental coordination mechanisms in ongoing operations, coordination tasks and mechanisms typically change over the course of the product development project’s life cycle. This article presents a taxonomy of these project coordination mechanisms. The taxonomy is based on an inductive analysis of development projects in nine printed circuit board operations and four aircraft hydraulic tubing operations. It distinguishes four modes of interdepartmental interaction---standards, schedules, mutual adaptation and teams (as in Thompson [Thompson, J. D. 1967. Organizations in Action . McGraw-Hill, New York.] and Van de Ven et al. [Van de Ven, A. H., A. L. Delbecq, R. Koenig, Jr. 1976. Determinants of coordination modes within organizations. Amer. Sociological Rev. 41 322--338.])---in each of three temporal phases: pre-project, product and process design, and manufacturing. Each of the resulting twelve matrix cells represents a distinct coordination mechanism. Since the objective of coordinating design and manufacturing departments is to ensure an acceptable fit between product design and manufacturing process parameters, the most efficient interdepartmental coordination mechanism is that which is able to deal with the uncertainty of this product/process fit at least cost to the organization. Extending Perrow’s (Perrow, C. 1967. A framework for the comparative analysis of organizations. Amer. Sociological Rev. 32 194--208.) analysis of the two dimensions of uncertainty to the case of product/process fit, the choice of interaction mode within each project phase is hypothesized to depend on the novelty of the product/process fit problem, and the relative importance of coordination effort across the three project phases is hypothesized to depend on the analyzability of the product/process fit problem.

Suggested Citation

  • Paul S. Adler, 1995. "Interdepartmental Interdependence and Coordination: The Case of the Design/Manufacturing Interface," Organization Science, INFORMS, vol. 6(2), pages 147-167, April.
  • Handle: RePEc:inm:ororsc:v:6:y:1995:i:2:p:147-167
    DOI: 10.1287/orsc.6.2.147
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/orsc.6.2.147
    Download Restriction: no

    File URL: https://libkey.io/10.1287/orsc.6.2.147?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ororsc:v:6:y:1995:i:2:p:147-167. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.