Author
Listed:
- Tal Alon
(Technion – Israel Institute of Technology, Haifa 3200003, Israel)
- Inbal Talgam-Cohen
(Technion – Israel Institute of Technology, Haifa 3200003, Israel)
- Ron Lavi
(Technion – Israel Institute of Technology, Haifa 3200003, Israel; University of Bath, Bath BA2 7AY, United Kingdom)
- Elisheva Shamash
(Keele University, Newcastle ST5 5BG, United Kingdom)
Abstract
We study contract design for welfare maximization in the well-known “common agency” model introduced in 1986 by Bernheim and Whinston. This model combines the challenges of coordinating multiple principals with the fundamental challenge of contract design: that principals have incomplete information of the agent’s choice of action. Our goal is to design contracts that satisfy truthfulness of the principals, welfare maximization by the agent, and two fundamental properties of individual rationality (IR) for the principals and limited liability (LL) for the agent. Our results reveal an inherent impossibility. Whereas for every common agency setting there exists a truthful and welfare-maximizing contract, which we refer to as “incomplete information Vickrey–Clarke–Groves contracts,” there is no such contract that also satisfies IR and LL for all settings. As our main results, we show that the class of settings for which there exists a contract that satisfies truthfulness, welfare maximization, LL, and IR is identifiable by a polynomial-time algorithm. Furthermore, for these settings, we design a polynomial-time computable contract: given valuation reports from the principals, it returns, if possible for the setting, a payment scheme for the agent that constitutes a contract with all desired properties. We also give a sufficient graph-theoretic condition on the population of principals that ensures the existence of such a contract and two truthful and welfare-maximizing contracts, in which one satisfies LL and the other one satisfies IR.
Suggested Citation
Tal Alon & Inbal Talgam-Cohen & Ron Lavi & Elisheva Shamash, 2024.
"Technical Note—Incomplete Information VCG Contracts for Common Agency,"
Operations Research, INFORMS, vol. 72(1), pages 288-299, January.
Handle:
RePEc:inm:oropre:v:72:y:2024:i:1:p:288-299
DOI: 10.1287/opre.2023.2475
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:72:y:2024:i:1:p:288-299. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.