Author
Listed:
- Pascale Bendotti
(OSIRIS Department, Electricité de France Recherche & Développement, 91120 Palaiseau, France; Centre National de la Recherche Scientifique, Operations Research Team, Laboratoire d’Informatique de Paris 6, Sorbonne Université, 75005 Paris, France)
- Philippe Chrétienne
(Centre National de la Recherche Scientifique, Operations Research Team, Laboratoire d’Informatique de Paris 6, Sorbonne Université, 75005 Paris, France)
- Pierre Fouilhoux
(Centre National de la Recherche Scientifique, Operations Research Team, Laboratoire d’Informatique de Paris 6, Sorbonne Université, 75005 Paris, France)
- Adèle Pass-Lanneau
(OSIRIS Department, Electricité de France Recherche & Développement, 91120 Palaiseau, France; Centre National de la Recherche Scientifique, Operations Research Team, Laboratoire d’Informatique de Paris 6, Sorbonne Université, 75005 Paris, France)
Abstract
In project scheduling with uncertain processing times, the decision maker often needs to compute a baseline schedule in advance while guaranteeing that some jobs will not be rescheduled later. Standard robust approaches either produce a schedule with a very large makespan or offer no guarantee on starting times of the jobs. The concept of anchor-robustness is introduced as a middle ground between these approaches. A subset of jobs is said to be anchored if the starting times of its jobs in the baseline schedule can be guaranteed. The Anchor-Robust Project Scheduling Problem (AnchRobPSP) is proposed as a robust two-stage problem to find a baseline schedule of bounded makespan and a max-weight subset of anchored jobs. AnchRobPSP is considered for several uncertainty sets, such as box or budgeted uncertainty sets. Dedicated graph models are presented. In particular, the existence of a compact mixed integer programming reformulation for budgeted uncertainty is proven. AnchRobPSP is shown to be NP-hard even for budgeted uncertainty. Polynomial and pseudopolynomial algorithms are devised for box uncertainty and special cases of budgeted uncertainty. According to numerical results, the proposed approaches solve large-scale instances and outperform classical affine decisions rules for AnchRobPSP. Insights on the price of anchor-robustness are given based on computations.
Suggested Citation
Pascale Bendotti & Philippe Chrétienne & Pierre Fouilhoux & Adèle Pass-Lanneau, 2023.
"The Anchor-Robust Project Scheduling Problem,"
Operations Research, INFORMS, vol. 71(6), pages 2267-2290, November.
Handle:
RePEc:inm:oropre:v:71:y:2023:i:6:p:2267-2290
DOI: 10.1287/opre.2022.2315
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:71:y:2023:i:6:p:2267-2290. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.