Parallel Machine Scheduling with Batch Setup Times

Author

Listed:
  • T. C. E. Cheng

    (Hong Kong Polytechnic, Hung Horn, Kowloon, Hong Kong)

  • Z.-L. Chen

    (Shanghai Transportation Planning Institute, Shanghai, People's Republic of China)

Abstract

We consider a problem of scheduling several batches of jobs on two identical parallel machines to minimize the total completion time of jobs. A setup time is incurred whenever there is a switch from processing a job in one batch to a job in another batch. When the number of jobs is arbitrary, the computational complexity of the problem is posed as an open problem in the literature. We show in this note that the problem is binary NP-hard even when the setup times are sequence independent and all processing times are equal.

Suggested Citation

  • T. C. E. Cheng & Z.-L. Chen, 1994. "Parallel Machine Scheduling with Batch Setup Times," Operations Research, INFORMS, vol. 42(6), pages 1171-1174, December.
  • Handle: RePEc:inm:oropre:v:42:y:1994:i:6:p:1171-1174
    DOI: 10.1287/opre.42.6.1171
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.42.6.1171
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.42.6.1171?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Byung-Cheon Choi & Myoung-Ju Park, 2015. "A Batch Scheduling Problem with Two Agents," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 32(06), pages 1-19, December.
    2. Liaee, Mohammad Mehdi & Emmons, Hamilton, 1997. "Scheduling families of jobs with setup times," International Journal of Production Economics, Elsevier, vol. 51(3), pages 165-176, September.
    3. Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
    4. Dunstall, Simon & Wirth, Andrew, 2005. "A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines," European Journal of Operational Research, Elsevier, vol. 167(2), pages 283-296, December.
    5. Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
    6. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:42:y:1994:i:6:p:1171-1174. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.