IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v20y1972i4p895-902.html
   My bibliography  Save this article

Technical Note—A Scheduling Problem Involving Sequence Dependent Changeover Times

Author

Listed:
  • A. G. Lockett

    (University of Manchester, Manchester, United Kingdom)

  • A. P. Muhlemann

    (University of Manchester, Manchester, United Kingdom)

Abstract

This note discusses a problem of scheduling jobs on a machine using various machine tools in which considerable changing of the tools is necessary, and the changeover time depends critically on the previous jobs. It derives a branch-and-bound algorithm, which has been shown to be computationally restrictive at the present time. Various heuristic methods have been tried and the computational results are very promising.

Suggested Citation

  • A. G. Lockett & A. P. Muhlemann, 1972. "Technical Note—A Scheduling Problem Involving Sequence Dependent Changeover Times," Operations Research, INFORMS, vol. 20(4), pages 895-902, August.
  • Handle: RePEc:inm:oropre:v:20:y:1972:i:4:p:895-902
    DOI: 10.1287/opre.20.4.895
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.20.4.895
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.20.4.895?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yashar Ahmadov & Petri Helo, 2018. "A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing," Annals of Operations Research, Springer, vol. 270(1), pages 5-24, November.
    2. Tan, Keah-Choon & Narasimhan, Ram & Rubin, Paul A. & Ragatz, Gary L., 2000. "A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times," Omega, Elsevier, vol. 28(3), pages 313-326, June.
    3. Tan, K. C. & Narasimhan, R., 1997. "Minimizing tardiness on a single processor with sequence-dependent setup times: a simulated annealing approach," Omega, Elsevier, vol. 25(6), pages 619-634, December.
    4. J. E. Beasley & M. Krishnamoorthy & Y. M. Sharaiha & D. Abramson, 2000. "Scheduling Aircraft Landings—The Static Case," Transportation Science, INFORMS, vol. 34(2), pages 180-197, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:20:y:1972:i:4:p:895-902. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.