Letter to the Editor---Critical Path Planning---PERT Integration

Author

Listed:
  • R. A. Bildson

    (Operations Research Department, General Motors Research Laboratories)

  • J. R. Gillespie

    (Operations Research Department, General Motors Research Laboratories)

Abstract

The Critical Path Programming System, even though restricted to project planning situations in which network structure and activity statistics are invariant during reduction of project duration, is proving to be a practical and useful technique. In fact, the efficiency of the algorithm developed by Kelley (Kelley, James E., Jr. 1961. Critical-path planning and scheduling: mathematical basis. Opns Res. 9 296--320.) for project time reduction permits one to adjust rapidly and inexpensively to changes in network structure or activity time-cost estimates as these changes develop. However, the effects of random variations in activity time estimates on earliest event occurrence time and project duration are not evaluated in the basic model described by Kelley, and the incorporation of the PERT procedure provides additional information concerning these effects.

Suggested Citation

  • R. A. Bildson & J. R. Gillespie, 1962. "Letter to the Editor---Critical Path Planning---PERT Integration," Operations Research, INFORMS, vol. 10(6), pages 909-912, December.
  • Handle: RePEc:inm:oropre:v:10:y:1962:i:6:p:909-912
    DOI: 10.1287/opre.10.6.909
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.10.6.909
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.10.6.909?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. R L Bregman, 2009. "Preemptive expediting to improve project due date performance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 120-129, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:10:y:1962:i:6:p:909-912. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.