IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v43y1997i8p1079-1092.html
   My bibliography  Save this article

Process Range in Manufacturing: An Empirical Study of Flexibility

Author

Listed:
  • David M. Upton

    (Graduate School of Business Administration, Harvard University, Boston, Massachusetts 02163)

Abstract

This paper examines the relationship between one form of manufacturing flexibility---process range---and structure, infrastructure, and managerial policy at the plant level. The paper provides evidence of the strength of the links between manufacturing flexibility and such factors as scale, technology vintage, computer integration, and workforce management. Data from 54 plants in the fine-paper industry are presented, and a model of the determinants of short-term flexibility is developed. The plants examined differed by a factor of 20 in their ability to accommodate large process variation. The evidence suggests that flexibility is strongly negatively related to scale and degree of computer integration, yet positively related to newer vintages of mechanical technology and workforce experience. Some results differ significantly from the prevailing view of the industry, in particular, that newer plants are less flexible. The paper shows that newer machine technology is more flexible once other factors are controlled for. In the longer term, the results show that management has a significant impact on the improvement of flexibility in operations, regardless of the technology and infrastructure in place. Plant network managers' views of flexibility are important. The data suggest that inflexible plants may be inflexible partly as a result of their being considered inflexible by network managers, and never being assigned the product range needed to improve the capability.

Suggested Citation

  • David M. Upton, 1997. "Process Range in Manufacturing: An Empirical Study of Flexibility," Management Science, INFORMS, vol. 43(8), pages 1079-1092, August.
  • Handle: RePEc:inm:ormnsc:v:43:y:1997:i:8:p:1079-1092
    DOI: 10.1287/mnsc.43.8.1079
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.43.8.1079
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.43.8.1079?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Pereira, Javier & Paulre, Bernard, 2001. "Flexibility in manufacturing systems: A relational and a dynamic approach," European Journal of Operational Research, Elsevier, vol. 130(1), pages 70-82, April.
    2. Vanteddu, Gangaraju & Chinnam, Ratna Babu & Gushikin, Oleg, 2011. "Supply chain focus dependent supplier selection problem," International Journal of Production Economics, Elsevier, vol. 129(1), pages 204-216, January.
    3. Jayashankar M. Swaminathan & Thomas R. Nitsch, 2007. "Managing Product Variety in Automobile Assembly: The Importance of the Sequencing Point," Interfaces, INFORMS, vol. 37(4), pages 324-333, August.
    4. Marta Pérez Pérez & Ana María Serrano Bedia & María Concepción López Fernández, 2016. "A review of manufacturing flexibility: systematising the concept," International Journal of Production Research, Taylor & Francis Journals, vol. 54(10), pages 3133-3148, May.
    5. Saravanan Kesavan & Bradley R. Staats & Wendell Gilland, 2014. "Volume Flexibility in Services: The Costs and Benefits of Flexible Labor Resources," Management Science, INFORMS, vol. 60(8), pages 1884-1906, August.
    6. Mohammad Asim & Saboohi Nasim, 2022. "Modeling Enterprise Flexibility and Competitiveness for Indian Pharmaceutical Firms: A Qualitative Study," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 23(4), pages 551-571, December.
    7. Yang, Liu & Ng, Chi To & Cheng, T.C.E. & Sun, Mingyao & Shao, Xuefeng & Li, Ruiqing, 2024. "Competition under demand uncertainty: The roles of technology and capacity strategy," European Journal of Operational Research, Elsevier, vol. 317(1), pages 185-204.
    8. Gebauer, Judith & Lee, Fei, 2007. "Enterprise System Flexibility and Implementation Strategies-Aligning Theory with Evidence from a Case Study," Working Papers 07-0113, University of Illinois at Urbana-Champaign, College of Business.
    9. Simms, Christopher & Frishammar, Johan & Ford, Nicholas, 2021. "The front end in radical process innovation projects: Sources of knowledge problems and coping mechanisms," Technovation, Elsevier, vol. 105(C).
    10. Lieven Demeester & Mei Qi & Luk N. Van Wassenhove, 2013. "Plant Networks for Processing Recyclable Materials," Manufacturing & Service Operations Management, INFORMS, vol. 15(4), pages 670-688, October.
    11. Merschmann, Ulf & Thonemann, Ulrich W., 2011. "Supply chain flexibility, uncertainty and firm performance: An empirical analysis of German manufacturing firms," International Journal of Production Economics, Elsevier, vol. 130(1), pages 43-53, March.
    12. Eskandarzadeh, Saman & Fahimnia, Behnam, 2024. "Containerised parcel delivery: Modelling and performance evaluation," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 186(C).
    13. Charles D. Brummitt & Kenan Huremović & Paolo Pin & Matthew H. Bonds & Fernando Vega-Redondo, 2017. "Contagious disruptions and complexity traps in economic development," Nature Human Behaviour, Nature, vol. 1(9), pages 665-672, September.
    14. Taylor Randall & Karl Ulrich, 2001. "Product Variety, Supply Chain Structure, and Firm Performance: Analysis of the U.S. Bicycle Industry," Management Science, INFORMS, vol. 47(12), pages 1588-1604, December.
    15. Parker, Rodney P. & Wirth, Andrew, 1999. "Manufacturing flexibility: Measures and relationships," European Journal of Operational Research, Elsevier, vol. 118(3), pages 429-449, November.
    16. Gong, Qiguo & Chen, Guohui & Zhang, Wen & Wang, Hui, 2022. "The role of humans in flexible smart factories," International Journal of Production Economics, Elsevier, vol. 254(C).
    17. Larry J. Menor & M. Murat Kristal & Eve D. Rosenzweig, 2007. "Examining the Influence of Operational Intellectual Capital on Capabilities and Performance," Manufacturing & Service Operations Management, INFORMS, vol. 9(4), pages 559-578, May.
    18. Wu, Y. & Frizelle, G. & Efstathiou, J., 2007. "A study on the cost of operational complexity in customer-supplier systems," International Journal of Production Economics, Elsevier, vol. 106(1), pages 217-229, March.
    19. Main Naser Alolayyan & Ahmmed Saadi Ibrahem, 2021. "Proposed Mathematical Model to Study and Analyze the Relationship Between Operational Flexibility Dimensions and Hospital Performance," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 22(4), pages 289-305, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:43:y:1997:i:8:p:1079-1092. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.