IDEAS home Printed from https://ideas.repec.org/a/inm/orinte/v15y1985i5p25-34.html
   My bibliography  Save this article

Multiproduct Production Scheduling at Owens-Corning Fiberglas

Author

Listed:
  • Michael D. Oliff

    (College of Business, The University of South Carolina, Columbia, South Carolina 29208)

  • E. Earl Burch

    (Management Department, Clemson University, Clemson, South Carolina 29631)

Abstract

To address production-scheduling decisions at Owens-Corning Fiberglas at three distinct levels---aggregate planning, disaggregate planning, and job scheduling---a three-phase hierarchical model was developed. A production-switching rule is used to determine aggregate inventory levels, production levels, and work-force levels. Lot sizes, line assignments, and inventory levels are determined for individual products via linear programming. Final job sequencing is accomplished by use of an efficient heuristic. Implementation of the model has resulted in annual savings of over $100,000 during the first two years of operation.

Suggested Citation

  • Michael D. Oliff & E. Earl Burch, 1985. "Multiproduct Production Scheduling at Owens-Corning Fiberglas," Interfaces, INFORMS, vol. 15(5), pages 25-34, October.
  • Handle: RePEc:inm:orinte:v:15:y:1985:i:5:p:25-34
    DOI: 10.1287/inte.15.5.25
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/inte.15.5.25
    Download Restriction: no

    File URL: https://libkey.io/10.1287/inte.15.5.25?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.

    More about this item

    Keywords

    production/scheduling;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orinte:v:15:y:1985:i:5:p:25-34. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.