Buffer Sizing in CCPM Portfolios with Different Resource Capacities

Author

Listed:
  • Mahdi Ghaffari

    (University of Manchester, Manchester, United Kingdom)

  • Margaret W. Emsley

    (University of Manchester, Manchester, United Kingdom)

Abstract

Although buffer sizing is one of the most investigated subjects in Critical Chain Project Management (CCPM), almost all the focus has been on its implications for single-project environments. Among the entire invented buffer sizing methods, the cut and paste method (C&PM) is the most accepted by practitioners and long-established CCPM software packages. This study concentrates on the use of C&PM in CCPM portfolios with different resource capacities with the aim of examining the performance of this method and identifying the most appropriate sizes of project and feeding buffers. This aim is pursued through considering ten different levels of resource capacity, conducting Monte Carlo simulations of randomly generated project data and comparing the results with deterministic duration values of the same portfolios with 30%, 40% and 50% buffer sizes. As a significant contribution, this study recommends what buffer sizes should be allotted in CCPM portfolios with different resource capacities.

Suggested Citation

  • Mahdi Ghaffari & Margaret W. Emsley, 2017. "Buffer Sizing in CCPM Portfolios with Different Resource Capacities," International Journal of Information Technology Project Management (IJITPM), IGI Global, vol. 8(3), pages 40-51, July.
  • Handle: RePEc:igg:jitpm0:v:8:y:2017:i:3:p:40-51
    as

    Download full text from publisher

    File URL: http://services.igi-global.com/resolvedoi/resolve.aspx?doi=10.4018/IJITPM.2017070103
    Download Restriction: no
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Sameer Bathallath & Åsa Smedberg & Harald Kjellin, 2019. "The Viable System Model for Diagnosing and Handling IT-Project Interdependencies in Large Portfolios," International Journal of Information Technology Project Management (IJITPM), IGI Global, vol. 10(1), pages 72-87, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:igg:jitpm0:v:8:y:2017:i:3:p:40-51. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Journal Editor (email available below). General contact details of provider: https://www.igi-global.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.