Author
Listed:
- S.C.L. Koh
(University of Sheffield, UK)
- A. Gunasekara
(University of Massachusetts-Dartmouth, USA)
- S.M. Saad
(Sheffield Hallam University, UK)
- S. Arunachalam
(University of East London, USA)
Abstract
The use of Enterprise Resource Planning (ERP) is becoming increasingly prevalent in many modern manufacturing enterprises. However, knowledge of their performance when perturbed simultaneously by several significant uncertainties is not as widespread as it should have been. This paper presents the developmental and experimental work on modeling uncertainty within an ERP multi-product, multi-level dependent demand manufacturing planning, and scheduling system in a simulation model developed using ARENA/SIMAN. To enumerate how uncertainty affects the performance of an ERP-controlled manufacturing system, the percentages of Finished Products Delivered Late (FPDL) and Parts Delivered Late (PDL) are measured. Sensitivity analysis shows that PDL gives a more accurate effect. Simulation results are analyzed using Analysis of Variance (ANOVA), which identifies four uncertainties; namely, late delivery from suppliers, machine breakdowns, unexpected/urgent changes to machine assignments, and customer design changes, which significantly affect PDL. Some uncertainties are found significantly interactive in two and three ways. They produce either knock-on and/or compound effects, a factor not generally recognized as a criterion for decision-making.
Suggested Citation
S.C.L. Koh & A. Gunasekara & S.M. Saad & S. Arunachalam, 2005.
"Uncertainty in ERP-Controlled Manufacturing Systems,"
International Journal of Enterprise Information Systems (IJEIS), IGI Global, vol. 1(3), pages 17-34, July.
Handle:
RePEc:igg:jeis00:v:1:y:2005:i:3:p:17-34
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:igg:jeis00:v:1:y:2005:i:3:p:17-34. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Journal Editor (email available below). General contact details of provider: https://www.igi-global.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.