A heuristic scheduling algorithm based on fuzzy logic and critical chain project management

Author

Listed:
  • Giovanni Mazzuto
  • Maurizio Bevilacqua
  • Filippo E. Ciarapica

Abstract

Project activity scheduling is one of the most important steps in numerous industrial processes, from building construction to manufacturing. The proposed paper aims at defining a multi-criteria priority indicator integrating the principles of critical chain project management (CCPM), which considers the human factor for delay in task completion, and the fuzzy logic (FL), which model human reasoning. The defined priority indicator provides a different distribution of the activity weights according to their position within the project scheduling. In particular, the fuzzy scheduling approach has been performed in order to overcome the lack in the literature about it. Results have demonstrated the efficacy and efficiency of the method improving the project makespan with a reduction equal to 40% compared to traditional approaches.

Suggested Citation

  • Giovanni Mazzuto & Maurizio Bevilacqua & Filippo E. Ciarapica, 2017. "A heuristic scheduling algorithm based on fuzzy logic and critical chain project management," International Journal of Project Organisation and Management, Inderscience Enterprises Ltd, vol. 9(4), pages 303-327.
  • Handle: RePEc:ids:ijpoma:v:9:y:2017:i:4:p:303-327
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=88244
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xiaokang Han & Wenzhou Yan & Ting Liu, 2022. "Critical chains and its randomness study for scheduling optimization," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(2), pages 844-854, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijpoma:v:9:y:2017:i:4:p:303-327. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=96 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.