IDEAS home Printed from https://ideas.repec.org/a/ids/ijpoma/v6y2014i1-2p33-47.html
   My bibliography  Save this article

Evaluating the effectiveness of task overlapping as a risk response strategy in engineering projects

Author

Listed:
  • Lucas Grèze
  • Robert Pellerin
  • Patrice Leclaire
  • Nathalie Perrier

Abstract

In the last two decades, the failure of multiple engineering projects has highlighted the importance of adopting risk management practices. While risk identification and risk assessment have been widely studied in the literature, only few authors have proposed formal tools for helping project managers to evaluate the effectiveness of their risk response plan. While some risk response measures might be easily validated, overlapping, a commonly used mitigation measure in engineering projects is difficult to evaluate because of the complex interactions between activities and resources. This paper proposes an evaluation model to measure the effectiveness of overlapping strategy as a risk response in terms of additional cost and total maximum time reduction. Results based on a large set of generated projects highlight the importance of three factors in the effectiveness of an overlapping strategy: the number of opportunities of overlapping, the maximum overlapping amount allowed, and the level of resource constraints.

Suggested Citation

  • Lucas Grèze & Robert Pellerin & Patrice Leclaire & Nathalie Perrier, 2014. "Evaluating the effectiveness of task overlapping as a risk response strategy in engineering projects," International Journal of Project Organisation and Management, Inderscience Enterprises Ltd, vol. 6(1/2), pages 33-47.
  • Handle: RePEc:ids:ijpoma:v:6:y:2014:i:1/2:p:33-47
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=59743
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nagesh N. Murthy & Haikady N. Nagaraja & Hossein Rikhtehgar Berenji, 2023. "Managing concurrency in cyclical projects under stochastic task environments: Vaccine development projects during pandemics," Production and Operations Management, Production and Operations Management Society, vol. 32(3), pages 951-971, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijpoma:v:6:y:2014:i:1/2:p:33-47. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=96 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.