Resource-constrained scheduling of construction projects and simulation of the entropy impact on a project's duration and cost

Author

Listed:
  • S.E. Christodoulou
  • E.S. Tezias
  • K.A. Galaras

Abstract

The paper reports on research work about the relationship between project resources and the entropy generated during construction, as well as on the development of a related mathematical model that utilises entropy for resource-constrained scheduling. The aim is to optimise the allocation of resources by use of an entropy metric, to study the delays which occur during a project and to relate them with the resources and the project's entropy. Entropy is taken as the disorder brought about by the fluctuation of resources and a higher entropy value relates to a higher risk in terms of schedule completion. The reported case study shows that a significant reduction in time (up to 25.7%) can be achieved by utilising the entropy method. Furthermore, should a resource constraint be imposed then the entropy approach results in a schedule that shows a 6.25% improvement in duration (and 8% in profit) over classical scheduling methods.

Suggested Citation

  • S.E. Christodoulou & E.S. Tezias & K.A. Galaras, 2012. "Resource-constrained scheduling of construction projects and simulation of the entropy impact on a project's duration and cost," International Journal of Project Organisation and Management, Inderscience Enterprises Ltd, vol. 4(4), pages 322-338.
  • Handle: RePEc:ids:ijpoma:v:4:y:2012:i:4:p:322-338
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=50328
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tsegaye Matiwos, 2019. "Efficient Procedure to Scheduling Construction Projects at the Planning Phase," Baltic Journal of Real Estate Economics and Construction Management, Sciendo, vol. 7(1), pages 60-80, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijpoma:v:4:y:2012:i:4:p:322-338. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=96 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.