A concept for developing construction element cost models for German residential building projects

Author

Listed:
  • Christian Stoy
  • Spiro Pollalis
  • Onur Dursun

Abstract

Early cost estimate of construction projects plays a vital role hence it forms a foundation for budgeting, planning, monitoring and even for litigation aims. In German practice, the first stage cost estimation is performed at the pre-design stage where no design details exist. Thus, the practical relevance of any model to be developed that requires further design information, would be questionable. The German norms describe construction cost elements as the subcategories for cost of construction works. Therefore, the accuracy of the first stage estimate can be improved by modelling construction cost elements where more detailed information incorporates. In this context, it is aimed to demonstrate the development of a predictive model for the most relevant cost element: external walls. Historical data was randomly sampled from Building Cost Information Centre (Baukosteninformationszentrum) database. The most significant predictors for cost of external walls were determined by backwards regression method. Multiple linear regression methodology is employed for the final parameter estimation. The results reveal that substantial variation in the cost of external walls can be explained by the proposed model which leads to high prediction accuracy. The development of the model is anticipated to influence further studies that address cost modelling in Germany.

Suggested Citation

  • Christian Stoy & Spiro Pollalis & Onur Dursun, 2012. "A concept for developing construction element cost models for German residential building projects," International Journal of Project Organisation and Management, Inderscience Enterprises Ltd, vol. 4(1), pages 38-53.
  • Handle: RePEc:ids:ijpoma:v:4:y:2012:i:1:p:38-53
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=45363
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Moayyad Al-Fawaeer & Abdul Sattar Al-Ali & Mousa Khaireddin, 2021. "The Impact of Changing the Expected Time and Variance Equations of the Project Activities on The Completion Time and Cost of the Project in PERT Model," International Journal of Business and Economics, School of Management Development, Feng Chia University, Taichung, Taiwan, vol. 20(2), pages 119-140, September.
    2. Moayyad Al-Fawaeer & Abdul Sattar Al-Ali & Mousa Khaireddin, 2021. "The Impact of Changing the Expected Time and Variance Equations of the Project Activities on The Completion Time and Cost of the Project in PERT Model," International Journal of Business and Economics, School of Management Development, Feng Chia University, Taichung, Taiwan, vol. 20(2), pages 1-22, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijpoma:v:4:y:2012:i:1:p:38-53. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=96 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.