IDEAS home Printed from https://ideas.repec.org/a/ids/ijpdev/v10y2010i1-2-3p201-216.html
   My bibliography  Save this article

The effect of inspection errors on the optimal batch size in reworkable production systems with scraps

Author

Listed:
  • Alireza Haji
  • Sharam Shadrokh Sikari
  • Ramin Shamsi

Abstract

The objective of this paper is to provide a framework to integrate the existence of products with imperfect-quality items, inspection errors, rework and scrap items into a single Economic Production Quantity (EPQ) model. To achieve this objective, a suitable mathematical model is defined and the optimal production lot size that minimises the total cost is obtained. Sensitivity analysis is carried out for this model. The sensitivity analysis results indicate that the model is very sensitive to defective proportions and type 1 errors of inspection. Nowadays, given the progress made, inspection errors are often ignored. But the findings of this study show that the values of EPQ and total cost are very sensitive to type 1 errors of inspection. If the existence of such errors is ignored, then the obtained results will differ considerably from the optimal outcome. This will impose additional costs to the system.

Suggested Citation

  • Alireza Haji & Sharam Shadrokh Sikari & Ramin Shamsi, 2010. "The effect of inspection errors on the optimal batch size in reworkable production systems with scraps," International Journal of Product Development, Inderscience Enterprises Ltd, vol. 10(1/2/3), pages 201-216.
  • Handle: RePEc:ids:ijpdev:v:10:y:2010:i:1/2/3:p:201-216
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=29993
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijpdev:v:10:y:2010:i:1/2/3:p:201-216. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=36 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.