IDEAS home Printed from https://ideas.repec.org/a/ids/ijores/v2y2007i4p380-399.html
   My bibliography  Save this article

A scheduling problem with unrelated parallel machines and sequence dependent setups

Author

Listed:
  • M. Gomez Ravetti
  • Geraldo R. Mateus
  • Pedro L. Rocha
  • Panos M. Pardalos

Abstract

This paper addresses a scheduling problem with unrelated parallel machines, sequence dependent setups and due dates. The problem is based on a real case and the objective is to minimise the sum of the makespan and the weighted delays. A mixed integer linear programming model is proposed and since the model considers realistic constraints, a metaheuristic based on GRASP is used as a solution method. Several versions of the metaheuristic are tested and multiple instances of the problem with different configurations are generated to test the solution quality and the computational performance.

Suggested Citation

  • M. Gomez Ravetti & Geraldo R. Mateus & Pedro L. Rocha & Panos M. Pardalos, 2007. "A scheduling problem with unrelated parallel machines and sequence dependent setups," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 2(4), pages 380-399.
  • Handle: RePEc:ids:ijores:v:2:y:2007:i:4:p:380-399
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=14169
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jürgen Strohhecker & Michael Hamann & Jörn-Henrik Thun, 2016. "Loading and sequencing heuristics for job scheduling on two unrelated parallel machines with long, sequence-dependent set-up times," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6747-6767, November.
    2. Jonathan De La Vega & Alfredo Moreno & Reinaldo Morabito & Pedro Munari, 2023. "A robust optimization approach for the unrelated parallel machine scheduling problem," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(1), pages 31-66, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijores:v:2:y:2007:i:4:p:380-399. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=170 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.