Project crashing in the presence of general non-linear activity time reduction costs

Author

Listed:
  • Moustapha Diaby
  • Jose M. Cruz
  • Aaron L. Nsakanda

Abstract

In this paper, we are concerned with the project crashing problem. The functional form we consider for the crashing costs is a negative-exponential form of the amount of capital invested that captures most of the more realistic forms that have been proposed in the literature. We formulate a non-linear optimisation model of the resulting generalised crashing problem, and develop a convex geometric programming approximation of this model. The model can be readily extended to handle situations where it is desired to determine the minimum capital investment needed to crash activities so that the total project duration does not exceed a given time length. Numerical illustrations of the approach are provided.

Suggested Citation

  • Moustapha Diaby & Jose M. Cruz & Aaron L. Nsakanda, 2011. "Project crashing in the presence of general non-linear activity time reduction costs," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 12(3), pages 318-332.
  • Handle: RePEc:ids:ijores:v:12:y:2011:i:3:p:318-332
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=42919
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Cyril Briand & Sandra Ulrich Ngueveu & Přemysl Šůcha, 2017. "Finding an optimal Nash equilibrium to the multi-agent project scheduling problem," Journal of Scheduling, Springer, vol. 20(5), pages 475-491, October.
    2. Osama Mohamed ElSahly & Salma Ahmed & Akmal Abdelfatah, 2023. "Systematic Review of the Time-Cost Optimization Models in Construction Management," Sustainability, MDPI, vol. 15(6), pages 1-20, March.
    3. Manuel A. Nunez & Lynn Kuo & I. Robert Chiang, 2022. "Managing risk-adjusted resource allocation for project time-cost tradeoffs," Annals of Operations Research, Springer, vol. 317(2), pages 717-735, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijores:v:12:y:2011:i:3:p:318-332. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=170 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.