IDEAS home Printed from https://ideas.repec.org/a/ids/ijisen/v37y2021i4p411-431.html
   My bibliography  Save this article

An EPQ model for an imperfect production system with rework, scrap and backorder

Author

Listed:
  • Pablo Biswas
  • Scott R. Schultz

Abstract

This paper deals with an imperfect two-stage manufacturing process that orders raw materials from a supplier and produces finished goods with defective items that can be reworked. The generation of scrap during the initial production stage, during inspection, and during the rework stage is also considered. To fulfil customer demand a permissible backorder is also considered. First, an inventory model is developed for this two-stage production process with instantaneous raw material order, in-cycle rework, and scrap. Then, a total cost function is developed to simultaneously find the optimal economic production quantity, optimal backorder quantity, and optimal order quantity. The cost function of the proposed inventory model is verified and validated using numerical examples and sensitivity analysis.

Suggested Citation

  • Pablo Biswas & Scott R. Schultz, 2021. "An EPQ model for an imperfect production system with rework, scrap and backorder," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 37(4), pages 411-431.
  • Handle: RePEc:ids:ijisen:v:37:y:2021:i:4:p:411-431
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=114048
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Erfan Nobil & Leopoldo Eduardo Cárdenas-Barrón & Dagoberto Garza-Núñez & Gerardo Treviño-Garza & Armando Céspedes-Mota & Imelda de Jesús Loera-Hernández & Neale R. Smith & Amir Hossein Nobil, 2023. "Machine Downtime Effect on the Warm-Up Period in an Economic Production Quantity Problem," Mathematics, MDPI, vol. 11(7), pages 1-23, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijisen:v:37:y:2021:i:4:p:411-431. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=188 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.