IDEAS home Printed from https://ideas.repec.org/a/ids/ijisen/v18y2014i1p95-124.html
   My bibliography  Save this article

Finite capacity material requirement planning system for assembly flow shop with alternative work centres

Author

Listed:
  • Teeradej Wuttipornpun
  • Pisal Yenradee

Abstract

This paper aims to develop a new finite capacity material requirement planning (FCMRP) system for an assembly flow shop with alternative work centres. It is a four-step procedure that firstly uses a variable lead-time MRP system to generate material and manufacturing plans. Secondly, dispatching rules are applied to determine sequence of customer orders. Thirdly, operations of orders are scheduled on the first and second priority work centres using various scheduling heuristics. Finally, the start times of operations are optimally adjusted by the LP model considering the finite capacity of all work centres and precedence of operations. Three industrial case studies are used to analyse the performances of the proposed system. The results show that the scheduling options/methods and dispatching rules significantly affect the performances of the proposed FCMRP system and the proposed FCMRP system greatly outperforms the FCMRP system of Wuttipornpun et al. (2006) considering overall performance index. In addition, the system requires short computational time when applied to industrial situations.

Suggested Citation

  • Teeradej Wuttipornpun & Pisal Yenradee, 2014. "Finite capacity material requirement planning system for assembly flow shop with alternative work centres," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 18(1), pages 95-124.
  • Handle: RePEc:ids:ijisen:v:18:y:2014:i:1:p:95-124
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=64343
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijisen:v:18:y:2014:i:1:p:95-124. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=188 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.