Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times

Author

Listed:
  • S. Hamed Hendizadeh
  • Tarek Y. ElMekkawy
  • G. Gary Wang

Abstract

The paper considers a flowshop scheduling problem of a manufacturing cell that contains families of jobs whose setup times are dependent on the manufacturing sequence of the families. Two objectives, namely the makespan and total flow time, have been considered simultaneously in this work. Since minimisation of each of these two objectives is an Np-Hard problem, a Multi-Objective Genetic Algorithm (MOGA) has been proposed to deal with the bi-criteria optimisation problem. The performance of the proposed MOGA is compared with the makespan and total flow time lower bounds. The proposed MOGA obtained solutions that only deviate by an average of 1% from the lower bounds. Future research will develop more efficient lower bounds for the total flow time and also compare the proposed method with other multiobjective meta-heuristics. [Received on 6 February 2007; Revised 6 June 2007; Accepted 16 June 2007]

Suggested Citation

  • S. Hamed Hendizadeh & Tarek Y. ElMekkawy & G. Gary Wang, 2007. "Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 1(4), pages 391-413.
  • Handle: RePEc:ids:eujine:v:1:y:2007:i:4:p:391-413
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=15388
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:eujine:v:1:y:2007:i:4:p:391-413. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=210 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.